Cheap 4t Natural Gas hot water boiler Singapore

Three tempering tube cheap 4t hot water boiler singapore installation and commissioning of the structure outlined hot water boiler is fast loading of the internal combustion level. A second high temperature flue gas successively washed roots and refluxed for three breathing tube, the smoke chamber into the atmosphere through the chimney. Gas hot water boiler equipped with the world famous burner, combustion using automatic adjustment, automatically adjust the water supply, the program starts, automatic control and other functions. The boiler has a compact, safe, reliable, easy to operate, installation speed, low pollution, low noise, high efficiency. Widely used in enterprises, hotels, hospitals, office buildings, civil construction and other industrial steam, life, mining and other facilities. This installation requires fast speed boiler installation, installation is very simple, the boiler does not require special ground base, only enough to withstand the ground to power. 1. Install the water supply line requires the highest level reservoir, generally not critical, the high from the ground to the reservoir tank, underground tank of water should be kept clean. Pool water outlet. For wire entrance filter water supply line. 2, the straight cross-section is mounted, the return pipe return pipe to be 0.5 meters above the bend radius should be 4 to 5 times the diameter of the pipe, the pipe should be installed at the highest automatic steam valve to prevent the steam from the pipe loop. At the same time, the general requirements of the highest level possible reliable reserve pool. When the boiler water level is below the line, the water will flow into the boiler when the next time you start. Filter wire 3 should be installed at the outlet (i.e., the inlet pipe) of the pool. Installation requires a supply line Burner fuel hose has two interfaces, and for the oil return into the oil, as long as the boiler return oil chamber and the oil corresponding feed pipe. Dedicated hydraulic system from the boiler tank to the burner pump port, an operation instruction for the burner 4 is provided. Chimney straight chimney installation requirements. The length of the chimney should not be too long, the stack height should be less than 5 meters. Chimney height should comply with relevant standards. Chimneys should be added raincap and smoke. Weight not directly on the boiler chimney host chimney 5, hydrostatic test shall be carried out after the installation of boiler water pressure test supervisor. Pressure test before proceeding to deal with internal boiler inspection, hydrostatic test pressure MPa, during hydrostatic testing, water pressure should slow down. When the pressure rises to 0.1MPa, the water pressure should be increased to 0.1MPa. When the ambient temperature is higher than 5C, hydrostatic test should be carried out; when the temperature is lower than 5, should be protected from freezing water pressure test. Hydrostatic test water is generally 20-70.6, should be as light fuel oil or gas oil (China) as the fuel, the fuel oil is generally heated to 100 deg.] C, a viscosity less 30E. Oil Qbw = 10200Kcal / kg LHV viscosity of the oil is lower than at 50 ℃ 200E, at less than about 80 ℃ 200E, 50e is less than the heat value of natural gas Qbw = 8550Kcal / kg LPG Qbw = 22000Kcal / kg.

The fuel can be natural gas boiler into gas-fired, city gas boiler, boiler coke oven gas, liquefied petroleum gas boilers and boiler; functions can be divided in accordance with KS-Q water natural gas boiler, CLHS / CWNS natural gas cheap 4t hot water boiler singapore (including natural gas heating boilers and gas boilers bath), LHS / WNS natural gas and steam boiler; can be configured in accordance with natural gas boiler is divided into vertical and horizontal natural gas boiler; flue gas flow can be divided according to a single backhaul gas three-pass boilers and natural gas boilers. Fuel oil-fired boiler is the difference between a fuel (such as diesel, oil, kerosene, etc.), natural gas boiler fuel is natural gas (such as natural gas, city gas, biogas as well as liquefied petroleum gas, etc.), depending on what fuel boiler combustion devices called burner, natural gas burner configuration called boiler natural gas boiler, oil boiler burner configuration called oil-fired boiler, oil-fired boiler and the difference between natural gas boiler that what fuel burners.

Operation of the boiler, including what? Including the operation of the boiler, what does? Following on from the Henan fast boiler company to tell you about: 1. The water level regulation of normal water level in the middle of the gauge (1) of the boiler. Operation with the magnitude of the load is adjusted: to maintain a high level during low load, high load to maintain a low level. Changes should not be down more than 40 mm. (2) to be run on the water level gauge to compare the two groups, if the water level display should be corrected promptly identify the cause. (3) To achieve a balanced continuous boiler feed water, ground water supply, water supply less, to maintain the water level in the normal water level fluctuates slightly in the vicinity. (4) load change is large, prone to false level. Pay attention to judgment, in order to avoid misuse. 2. Steam pressure regulator (1) when the boiler must constantly monitor the pressure gauge indicated. To maintain stable steam pressure, boiler pressure must not exceed the design pressure. (2) increasing the boiler load: Steam pressure decreased boiler load is increased, if the level is high at this time, the amount of water should be reduced to a water supply or suspend, the amount of coal and increase the air volume. Gradually increase the amount of water at the same time to strengthen the burning, keep the steam pressure and the water level is normal. (3) boiler load reduction: the vapor pressure rises to reduce boiler load, if the level is high at this time, the amount of coal should be reduced and the air volume, reduced combustion. Then the appropriate water reduction or suspension of water supply to the water vapor pressure and stability in the nominal range. Then press the normal combustion and to adjust the amount of water. If the actual water level within the boiler is low, to increase the amount of water should, until the water level returns to normal after the combustion and needs to be adjusted according to the water vapor pressure and load changes. 3. Combustion adjustment (1) combustion index. Normal combustion boiler comprises a uniform supply of the fuel, reasonable ventilation, adjusting three basic aspects combustion. B. maintain a high temperature of the combustion chamber temperature of the upper layer is preferably in the 1100-1300 ℃, flame orange in color. Flame reddish color indicates that the amount is not enough to the wind, the color white indicates that excessive wind. It should be appropriately adjusted. C. fuel ash to reduce ash content in the combustibles to be below 10%. d. reducing the temperature of the exhaust gas boiler exhaust gas temperature should be controlled below 200 ℃. e. excess air negative pressure holding furnace boiler 1.2-1.4, by adjusting the balance of the blowers to maintain the furnace pressure is 2-3mm. F. to improve the thermal efficiency of the boiler thermal efficiency of the boiler should be kept above 60%. (2) adjusting the combustion a. Reasonable amount and the distribution of fuel to the amount of air needed for combustion. Ventilation should first increase the amount of fuel increases, it should first reduce the amount of fuel supply reduced ventilation. b wind principle feature: burn promoting intermediate ends. That is, after the coal into the coal starts to warm up the shutter, fire line front arch, the primary combustion zone, the middle grate to burn the rear grate zone. c is the normal combustion conditions: fuel ignition start at 300mm from the shutter of coal, even flames, the fire bed formation, at the end away from the combustion grate at the end of 300-500mm. d. Hold appropriate furnace temperature to avoid coking. E. fire bed to maintain the homogeneous combustion, to avoid burning fire bed obliquely. F. less than 30 minutes residence time of the fuel on the grate. Our company provides services related to the installation of the boiler!

July 26, 2016, Beijing, China Everbright Paper Co., Ltd. and the company signed a "split 6 tons of steam condensing gas steam boiler contract" by the company responsible for the WNS6-1.25-YQ split condensing gas boiler steam to all production, installation and commissioning work. The product is the use of condensing technology, effective emission of harmful substances SOx, NOx, COx, is industrial boilers efficient and environmentally friendly solutions.