gas fired steam boiler price in haridwar

Shandong Zhaoyuan Mining Group Co., Ltd. is a large state-owned local asset management companies, gold mining dressing and smelting for leading industries, operates in the area of ​​tourism, services, precious metals, real estate, eco-agriculture, with total assets of 10.2 billion yuan, Shanghai gold Exchange is an international provider of standard gold bullion. July 2017, Shandong Mining Group and fast boiler steam signed a 0.5-ton electric heating fired steam boiler price in haridwar which mainly produce steam for metallurgical mineral processing and other manufacturing processes, energy defeating small, strong ability to supply steam .

Method for safe operation of fired steam boiler price in haridwars steam boiler before use, must be checked for damage of the insulating layer, to check the burner is operating correctly, and to check the position of the opening degree of the valve to ensure it is correct. Must be checked for automatic control instruments and equipment safety equipment accessories, equipment, in order to comply with the requirements. Check item prior to ignition of the steam boiler: open valve before oil circulation pump, oil heating valve is opened, adjusted reasonably high level of the tank, the gas pressure is determined before the natural gas burner ignition must be within the range, the power good . Refers to the operation of the steam boiler is refluxed pressure activated device circulating pump, the circulating pump outlet, inlet, outlet, and the system, it is in the normal range. Circulation pump run for 30 minutes. After the stability of the system, the next step. Open the gas tube steam boiler manual valve, button start-up burner, natural gas burner into the furnace, and then the ignition, the flame remains stable, i.e. is in a safe operating condition. In the firing process steam boiler, if you accidentally quenching phenomenon occurs, the device will automatically interlock burner saver appear. It must be promptly cut off the natural gas pipeline to start the furnace purification. Replacement of the residual gas in the furnace and closed. The system load requirements, temperature requirements and thermal oil outlet, the burner can automatically adjust the size of the fire source.

50, when arranged inside the boiler room to note a safety distance, the front end of the boiler ready spacing of not less than 2/3 of the length of the furnace, and not less than 2 m; vertical boiler can be shortened; bulk boiler is not less than 4 m and does not affect the blast furnace operation and maintenance. 2, the boiler side and rear channel spacing of not less than 0.8 m, and should meet the operational and maintenance (such as replacement tube bundle cleaning, stirring the fire, etc.) requirements. 3, the top horizontal boiler headroom not less than 2 m; vertical boiler top clearance height to facilitate the operation and maintenance; headroom boiler room the other channels, should not be less than 2 meters, when the passage of time and no need to operate its headroom height of 0.7 meters. 4, the boiler room is provided for two or more boilers, the boiler the distance between adjacent not less than 1 to 1.5 times the cylinder diameter of the boiler. 5, the boiler room is generally preferred fireman operation chamber provided, on the total rated greater than or equal evaporation 4t / h fired steam boiler price in haridwar (heating or hot water boiler is equal to or greater than 2.8MW) must be provided stoker operating room. Electric boiler tank may be provided in front of the boiler, and to ensure the art to fireman facing boiler water gauge, pressure gauge and other instruments during operation. 6, to the total rated evaporation 2t / h fuel gas boiler room to be provided or water spray foam fire extinguisher system, should outdoor outdoor fire hydrant, other fire-fighting equipment should also have the boiler room. 7, the fuel in the boiler room daily oil tank, the oil pump is generally not located in the boiler room, between daily oil tank, the oil pump between the application of the fire resistance of greater than 2.00h wall, the fire resistance of greater than 1.50h floor spaced from the other parts. Daily fuel tank between the boiler room and the door between the oil pump should be able to self-closing fire doors Class A, and let the oil block measures. Household upper tank return pipe to be provided, should be greater than the oil return pipe back to the oil pump. 8, an oil tank and all piping must have a reliable electrostatic grounding, the grounding resistance should not exceed 30 ohms. 9, gas boiler room boiler design should also comply with the relevant safety requirements of gas boiler room.

Matters needing attention in installation of Gas-fired BoilerGas-fired boiler also says that gas-fired heating boiler is a kind of boiler which uses gas combustion to heat water to satisfy people's heating. It belongs to the category of domestic boiler. By gas-fired heating boiler we usually refer to gas-fired atmospheric hot water boiler, gas including natural gas, liquefied gas, city gas, coke oven gas, biogas and so on. There are explosion-proof doors on the rear of the fuel-fired boiler or on the smoke pipe, and the position of the explosion-proof doors should be conducive to the discharge of the explosion. In cases where explosive gas may endanger the safety of operators, a pressure relief guide tube shall be installed on the explosion-proof door. The installation of boilers, auxiliary machines and water treatment equipment shall be in accordance with the technical requirements of the equipment manufacturing plant. . The equipment foundation must wait until the equipment arrives and checks correctly with the design drawing before construction. 3. When installing the equipment, avoid the equipment, and the installation material should be stacked on the floor. When using building column, beam lifting equipment, the bearing capacity of beam and column must be verified in advance. 4. After installation of oil, gas, hot water and steam pipes, the pressure test acceptance shall be carried out according to the Code for Construction and acceptance of Industrial Metal Piping Engineering GB 50235 / 1997.