oil fired steam boiler with automatic protection best quality

10 tons of gas turbine fired steam boiler with automatic protection best quality burner it currently requires 10 tons of steam gas boiler steam boiler there are two types WNS10-1.25-Q SZS10-1.25-Q, and two kinds, i.e., three horizontal wet return back structure and vertical type double drum "D" type arrangement quick water tube boiler. It consists of upper and lower drum, membrane wall, superheater, economizer and convection bank composition, the burner disposed on the front wall, the fuel combustion in the furnace, the flue gas through the first convection bank, superheater, a second convection economizer tubes and into the chimney. 10 tons of gas boiler burners have split and one-piece points, integrated burner fan I see are axial fans, centrifugal fans with split, 90% of the 10 tons of gas boiler burner all-in-one, as to form two burner what a good way, this has yet to be explored. SZS10-1.25-Q has the following features in gas boiler: The product has the following characteristics: ⑴ This double boiler drum "D" type arrangement, a compact, small footprint, good flame fullness. ⑵ boiler lower support mode can be free to expand upwards. ⑶ using membrane wall furnace wall structure which reduces maintenance work and use of refractory bricks. This boiler ⑷ fender an airtight closed welded structure, good sealing furnace wall; outer layer of pressed boards, appearance, beautiful. ⑸ this boiler furnace inspection hole is provided for the use, maintenance provides a great convenience. Roof has explosion-proof doors. This quick ⑹ boiler structure can effectively shorten the installation cycle. ⑺ high thermal resistance material as a heat insulating layer, good insulation properties. ⑻ economizer arranged tail, can effectively control the exhaust gas temperature, high thermal efficiency of the boiler. ⑼ whole boiler steel holder on a strong base, convenient installation and transportation. ⑽ boiler heating surface has a surplus, soft drinks and large enough space to ensure the stability of the boiler parameters. ⑾ using automatic burner, combustion efficiency and an ignition control program and overpressure, flame protection. ⑿ continuous electrically adjustable water supply, and having a low water level alarm, the protection function chain. ⒀ using spray desuperheater, sensitive temperature adjustment, temperature control large amplitude. Second, the structure Introduction boiler 1, the main evaporation rated specifications: D = 10t / h of superheated steam temperature: t = 300 ℃ superheated steam pressure: P = 1.25MPa water temperature: tgs = 20 ℃ (except normal saline) boiler efficiency: η = 92.6% exhaust temperature: tpy = 136.3 ℃ desuperheater tYPE: hydrostatic pressure test boiler desuperheater spray: 1.75 MPa number of valve: drum 2 PN2.5, DN80 full open spring valve overheating an outlet header PN2.5, DN50 full open spring valve design of the fuel: 0 light diesel oil (Qydw = 41870kJ / kg); consumption 749.9kg / h of natural gas (Qydw = 37060kJ / Nm3); 847.3 consumption Nm3 / h

The szs series and wns series of oil and gas boilers produced by ZG boiler are the most widely used. In a big way, it can be widely used in heating, industrial steam and hot water supply, and the company has its own power station. Such as school heating, hotel bath hot water supply, food factory industrial steam supply. These two oil and gas boilers are all fast-assembling boilers with low capital investment and high degree of automation. Customers can choose according to their needs.

Due to increase market demand for air conditioning, we increased the number of production lines, faced with the urgent need of a fired steam boiler with automatic protection best quality problems. Emergence of fast boiler is time for us to solve this problem. From the start of contract manufacturing to transportation to our company for installation and operation, Fang fast only 35 days to solve our urgent needs. --customer feedback

Three tempering tube hot water boiler installation and commissioning of the structure outlined hot water boiler is fast loading of the internal combustion level. A second high temperature flue gas successively washed roots and refluxed for three breathing tube, the smoke chamber into the atmosphere through the chimney. Gas hot water boiler equipped with the world famous burner, combustion using automatic adjustment, automatically adjust the water supply, the program starts, automatic control and other functions. The boiler has a compact, safe, reliable, easy to operate, installation speed, low pollution, low noise, high efficiency. Widely used in enterprises, hotels, hospitals, office buildings, civil construction and other industrial steam, life, mining and other facilities. This installation requires fast speed boiler installation, installation is very simple, the boiler does not require special ground base, only enough to withstand the ground to power. 1. Install the water supply line requires the highest level reservoir, generally not critical, the high from the ground to the reservoir tank, underground tank of water should be kept clean. Pool water outlet. For wire entrance filter water supply line. 2, the straight cross-section is mounted, the return pipe return pipe to be 0.5 meters above the bend radius should be 4 to 5 times the diameter of the pipe, the pipe should be installed at the highest automatic steam valve to prevent the steam from the pipe loop. At the same time, the general requirements of the highest level possible reliable reserve pool. When the boiler water level is below the line, the water will flow into the boiler when the next time you start. Filter wire 3 should be installed at the outlet (i.e., the inlet pipe) of the pool. Installation requires a supply line Burner fuel hose has two interfaces, and for the oil return into the oil, as long as the boiler return oil chamber and the oil corresponding feed pipe. Dedicated hydraulic system from the boiler tank to the burner pump port, an operation instruction for the burner 4 is provided. Chimney straight chimney installation requirements. The length of the chimney should not be too long, the stack height should be less than 5 meters. Chimney height should comply with relevant standards. Chimneys should be added raincap and smoke. Weight not directly on the boiler chimney host chimney 5, hydrostatic test shall be carried out after the installation of boiler water pressure test supervisor. Pressure test before proceeding to deal with internal boiler inspection, hydrostatic test pressure MPa, during hydrostatic testing, water pressure should slow down. When the pressure rises to 0.1MPa, the water pressure should be increased to 0.1MPa. When the ambient temperature is higher than 5C, hydrostatic test should be carried out; when the temperature is lower than 5, should be protected from freezing water pressure test. Hydrostatic test water is generally 20-70.6, should be as light fuel oil or gas oil (China) as the fuel, the fuel oil is generally heated to 100 deg.] C, a viscosity less 30E. Oil Qbw = 10200Kcal / kg LHV viscosity of the oil is lower than at 50 ℃ 200E, at less than about 80 ℃ 200E, 50e is less than the heat value of natural gas Qbw = 8550Kcal / kg LPG Qbw = 22000Kcal / kg.