Agent Industrial 1t coal steam boiler Thailand

About six tons of agent industrial 1t coal steam boiler thailand shutdown of a temporary shutdown: It is planned, therefore slow cooling during shutdown protection device, it should also pay attention to safety, pause furnace according to the rules in Chapter IV Fenghuo (pressure fire) get on. 2, safety shutdown: care should be completely stopped even on normal operation plan for 1 to 3 months to be a shutdown, shutdown should maintain more safety injection apparatus, after the shutdown, and other water-cooled furnace to below 70 ℃ when they let go of the gas, open manholes, hand holes, rinse the pot with water scale. 3, emergency shutdown: the boiler operation, when the case of the following circumstances, should an emergency shutdown, and notify the relevant authorities. (1) expanding the cease-fire should first see if the water table level is called to take water law. If Inception water table, water cock side, and then close the steam cock, and then turn on the water faucet open and close repeatedly called after water, still can not see the water. (2) All water supply equipment failure. (3) All water gauge, pressure gauge, safety one of all the failures. (4) a boiler or furnace wall element damage, serious threat to the safe operation of the boiler, emergency shutdown, should focus on preventing the stop of the accident and the specific steps as follows: ① first blowing off; ② the coal on the grate red raking; ③ Close induced draft fan.

Reducing the project covers an area large agent industrial 1t coal steam boiler thailand and therefore a large high-pressure steam boiler pipe insulation manufacturers buried heating pipe does not require masonry huge trench, just insulation pipe buried underground people, thus greatly reducing the project area, reducing earthwork open dig about 50% or more, reducing the amount of civil masonry and concrete 90%. Gas boiler, pipe insulation and processed in parallel trenching site, linker site only, shorten the construction period can be greater than about 50%, thermokeeping pipe is widely used a liquid, a gas pipeline network, Chemical Engineering Oil pipe insulation, the vapor Hence largest chemical boiler, central heating network, air conditioning and ventilation ducts, municipal engineering. Buried pipe insulation is one kind of good insulation properties, plus safe, reliable, low construction cost of the prefabricated buried pipe insulation. Effective solution incubated urban centralized heating with a high temperature heat input thermokeeping tube, sliding and water lubrication problems exposed tube ends. Buried pipe insulation not only has the traditional trench laying of pipelines and overhead incomparable advanced technology, practical performance, but also has significant social and economic benefits, but also energy-saving heating of effective measures. Prefabricated buried pipe insulation technology using buried heating pipe, marking polyurethane insulation heating pipe technology development has entered a new starting point. Reporters noted that this year again Yajian steel production capacity of about 50 million tons, quit more than 150 million tons of coal production capacity. Even the industry is expected this year to production capacity will be extended to glass, construction accounted for a large reduction in the steam boiler electrolytic aluminum, cement and shipbuilding industries. High pressure steam boiler pipe insulation manufacturers of polyurethane buried insulating pipe evacuated provided.

Coal fired CFB boiler technology:

In view of the possible near-term benefits, ZG recently funded an assessment of coal fired power plants equipped with three different combustion systems: Kinds of coal, Circulating Fluidized Bed (CFB), and biomass fired circulating fluidized bed. The purpose of this study was to establish, through engineering analysis, the most cost-effective performance potential available through improvement in the steam conditions and combustion systems.

Fang fast open class formal lecture: products, services both hands April 18, Fang fast open class smooth commencement, partners from across the country converge in the exchange of learning party headquarters R & D building fast training room, professional trainers to share a boiler features, installation and operation precautions, commissioning maintenance process, rapid fault verification, and troubleshooting tips, and other professional knowledge, students listen carefully, positive answer questions, and the atmosphere is very active.