boiler Industrial Distributor 1t Malaysia

Still 8 cultural and creative industrial park is located in the Chaoyang District, Beijing, Bali Zhuang Chen Lin, No. 2, construction area of ​​493,300 square meters. Surrounded by quintessence of Court, Red Sandalwood Museum, Shanxi Museum and other famous attractions. Due to its special geographical location, has very stringent requirements for providing heat boiler industrial distributor 1t malaysia plants. Carefully selected to finalize cooperation with our company, signed a two He Lide series complete condensation pressure hot water boiler.

Bath center, hotels, hospitals, schools can use smaller heating boiler industrial distributor 1t malaysia it? How much tonnage appropriate?

Recently, we received a lot of hotels, bathing centers, hospitals, schools feedback, these small non-industrial heating and hot water project, you can use heating boiler it? Which is more appropriate type of heating boiler it? Fast boiler come to you to talk about.

Treatment squib superheater tube 1, a slight rupture superheater tubes, can be appropriately reduced load, to maintain operation within a short time, this time should be closely monitored leak situation, at the same time, rapid start standby boiler industrial distributor 1t malaysia. If monitoring the situation worse, should be shutdown as soon as possible. 2, when the hose rupture severe superheater must be emergency stop.

Boiler manufacturers will provide an operating instruction manual for each boiler industrial distributor 1t malaysia steam boiler, fireman personnel within the enterprise in accordance with certain practices which control the boiler use, avoid due to incorrect handling of waste and reduce the life of the boiler and incomplete combustion of fuel caused Pollution. Second, when there are a number of boiler room boiler, should be assigned overall efficiency of each unit load boiler highest principle of distribution. Except in special circumstances, do not put pressure steam expansion changed to a low-pressure steam, which is likely to be wasted use of power. Third, the installation of blowdown or heat exchanger.