Energy Saving Agent 1t gas steam boiler Armenia

For winning the Battle of Blue Sky, Jiuquan City, Gansu Province, issued in 2019 action to implement the program, which requires: accelerate the implementation of the transformation of ultra-low emission thermal power and other key industries. Details are as follows.

First, in an orderly clean heating in winter

Seriously implement the "clean Gansu winter heating overall plan (2017-2021 years)" and "clean Jiuquan City winter heating embodiment (2017-2021 years)", combined with the overall urban planning and development of real priority to the development of central heating and accelerating focus heating pipe network construction and transformation progress, and constantly improve the urban central heating cover, reduce civil bulk coal usage, central heating difficult coverage areas, speed up the implementation of all types of decentralized clean heating.

Second, the full completion of the comprehensive improvement of coal-fired boilers

And by phasing out the demolition, clean energy transformation, environmental compliance management, etc., complete with coal-fired boiler remediation tasks. Increase efforts to eliminate small coal-fired boilers, the county level and above urban area (high-tech zones, except through the open area, industrial parks and industrial agglomeration area) basically eliminated 10 tons of steam per hour and coal-fired boilers and furnaces tea, operational stove, grain storage and drying equipment, coal-fired facilities, in principle, to 35 tons of steam per hour, the new coal-fired boilers, in principle, to the rest of 10 tons of steam per hour, a new coal-fired boilers.

Third, strengthening the total control and the clean use of coal

Issued according to the provincial total coal consumption control objectives and annual coal consumption indicators, strengthen coal total control. New coal coal project implementation reduction alternative, reduce the proportion of coal in energy consumption, improve power coal in total coal consumption in proportion.

Fourth, accelerate the development of clean energy and new energy

Gradually increase the proportion of non-fossil energy consumption, the orderly development of hydropower, optimizing wind, solar energy development layout, coupled encourage the promotion of coal-fired biomass power generation, local conditions to develop biomass energy, geothermal energy, to ensure that by 2020, the city's non-fossil fuels in energy the proportion of total consumption reached 20%. Increase renewable energy consumptive efforts to solve the basic water abandoned, abandoned wind, abandoned light problem.

After electric energy saving agent 1t steam boiler armenia shutdown, how maintenance? When long-term disabled electric steam boiler, furnace should pay great attention to external corrosion and maintenance problems. First, after power shutdown cooling steam boiler, the ash must be thoroughly cleaned and the heating surface fouling the upper grate, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. If the boiler shutdown a long time, after the complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As for anti-corrosion maintenance methods inside the furnace shutdown, the shutdown Yaoan the length of time to be. In general, no more than one month shutdown maintenance wet available, more than one month should be taken to maintain dry. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover, valve steam, the water pipe change must cut lime powder should be replaced.

Coal-fired boilers have been abandoned prospects for environmental protection boiler can be expected by the end of 2014, the city authorities will be coal-fired boiler, tea bath furnace conduct a comprehensive investigation, the completion of the city's coal-fired boiler, tea bath furnace investigation to establish the investigation file. By the end of 2015, the central heating, coal to gas, coal to electricity projects, urban built-up area of ​​Dazhou out of 10 tons of steam per hour of coal-fired boilers, tea bath furnace, a ban on new coal-fired boilers; counties (cities ) no new 10 tons of steam per hour of coal-fired boilers. By the end of 2017, within the city's jurisdiction phasing out 10 tons of steam per hour of coal-fired boilers. In other parts of the supply pipe network covering less than, change electricity, new energy or clean coal, promote the use of environmentally friendly energy efficient boiler systems. Chemical, paper, printing and dyeing, pharmaceutical and other business gathering area, by focusing on the construction of cogeneration units dispersed phase out coal-fired boilers. 2014 Pudong District, will complete the transformation of 160 coal-fired boilers Recently, the district held a coal-fired (heavy oil) boiler will work to promote clean energy alternatives, summed up the situation in our region to develop clean energy alternatives work in 2013, the deployment of the main work this year. Meeting was informed that, in 2014, the towns (industrial area), belonged to the company will accelerate the region natural gas pipeline network planning, heating network planning revision to develop industrial parks, to ensure that policies and funding in place, and take a variety of measures to ensure the successful completion of 160 units / sets of coal-fired boiler with 17 units / sets of clean energy alternative industrial furnace work this year. In 2013, our region continues to improve project access threshold, eliminate backward production capacity a total of 44, 159 to complete the clean energy alternative.

Gas fired horizontal style and low pressure gas energy saving agent 1t steam boiler armenia is designed specifically for the requirements of the commercial market and is available in sizes ranging from 1-20 tons for 0.7-1.6 MPa steam pressure.This type boiler also can use diesel oil,light oil or heavy oil as fuel.