oil well oil steam boiler

Steam boiler furnace operating point first launched circulating pump equipment circulating pump outlet, into the furnace, the pressure released, and the system back to the oil pressure, make sure that in the positive practice mode. Circulation pump run for 30 minutes, after the stable operation of the system before it can enter the next step. Open gas pipeline manual valve well steam boiler, burner launch button, natural gas burner into the furnace, and then burned, keeping the flame stable condition, is in the safe operation of the equipment. Incineration steam boiler, once the accident shut down if the phenomenon occurs, the device will take the initiative burner interlock protection status, should be promptly cut off natural gas pipeline, launched a purge function of the furnace, the furnace inside air replaced more than clean shutdown. System according to load requirements, temperature requirements and thermal oil outlet, the burner can be actively adjust the size of the amount of fire. Steam boiler heat exchanger is generally divided into two, one is directly touch the touch exchanger, and the other is the direct heat exchanger, which are separate apparatus for flue gas waste heat recovery, energy saving effect complete . Generally steam boiler practices can be simple progress through the transformation of energy-saving action, such as increasing the waste heat recovery equipment installed on, which is energy-saving advantages of steam boilers. Energy savings from the big side, is to promote the cause of saving the country, to say that small ways to create more profits for the company to save costs, the choice of one of the heat exchanger is a good way to complete energy policy.

According to fuel (electricity, oil, gas), oil-fired gas boiler can be divided into three kinds: electric well steam boiler, oil-fired steam boiler and gas-fired steam boiler. According to the structure can be divided into vertical steam boilers, horizontal steam boilers, small and medium-sized steam boilers are mostly single, double-return vertical structure, large-scale steam boilers are mostly three-way horizontal structure. The following is the boiler pressure fire shutdown time more than 6 hours, the boiler main steam valve should be closed after a period of pressing fire, opening the superheater outlet header drain valve, to cool the superheater. If the air pressure rises after the main steam valve is closed, it can be used to lower the pressure of the boiler by feeding the water into the boiler and simultaneously discharging the water. Press. When the boiler resumes operation, it needs to go through the pressure rise and protect step 2. There is still steam pressure in the pot during the shutdown period of the pressure fire, so it is still necessary to pay attention to monitoring and make the boiler keep the allowable water level 3, the boiler with cast iron gas saving gas, after the boiler stops feed water, The gas-saving flue baffle shall be closed, the side-hearth baffle opened or used in the circulating pipeline to stop the water temperature in the gas-saving area exceeding the specified value of 4, the proper discharge shall be carried out during the shut-down of the furnace under pressure fire, and the sediment in the furnace shall be excluded. The operation of circulating water pump should not be stopped immediately after the furnace shut down. The circulating water of network should be kept circulating in the system for a period of time, and the water temperature of boiler outlet should be lowered below 50oC. The operation of circulating water pump can not be stopped until the operation of circulating pump is stopped.

Choose suitable gas fired boiler for biscuits company

Whether you choose a Firetube boiler or Watertube boiler, large or small capacity, gas fired boiler or oil fired boiler, you’ll still get the unprecedented ZG boiler quality you demand. Now gas fired steam boiler is cost low, environmental for biscuits company, steam sterilizers generally produce sterile product reliably, and steam quality can be controlled in biscuits steam sterilization.

During installation, the technical team fast boiler plant according to the specific needs of our environment, our rational arrangement of stacks, pipes, and other auxiliary equipment, let us bring a lot of convenience in the latter part of the course. Fang fast responsible attitude also gives us impressed, sent a technical team for installation, commissioning and training to us, let us rest assured, peace of mind, peace of mind. --customer feedback