Factory Price Commercial 10t Natural Gas steam boiler

Pressure boiler furnace designed with the characteristics of the fuel pressure boiler furnace designed with the two main parts of the boiler body is characteristic of the furnace and the fuel pressure drum. Furnace, also called a combustion chamber, a fuel combustion space. The solid fuel on the grate furnace called stratified combustion furnace, also called fire bed furnace, and a liquid, gaseous or solid powdered fuel is injected into the combustion chamber in a combustion furnace, combustion chamber furnace referred to, also known as for the furnace fire chamber, a liquid, a gas or a pulverized solid fuel injected into the combustion chamber of the furnace, also known as combustion furnace; coal particles and air lift to a boiling state combustion furnace for combustion of low-grade fuel is called boiling furnace, also known as fluidized bed furnace; high-speed rotation of the coal particles by a gas flow and strongly cylindrical combustion furnace known as a cyclone furnace. Atmospheric overall configuration of a boiler furnace body includes two parts and auxiliary equipment. Boiler furnace, drum, burner, water wall superheater, economizer, air preheater, and the furnace wall, etc. The main frame member constituting the core part of the steam production, called boiler. Furnace design needs to fully consider the characteristics of the fuel used. Each boiler combustion of the original fuel should as much as possible. Different characteristics of fuel economy will reduce boiler operation and reliability. It is a natural circulation boiler drum and multiple forced circulation boiler, economizer receiving water circulation circuit connected to the saturated steam supplied to the superheater of the cylindrical container. Boiler drum is made of high quality steel plate, it is one of the heaviest components of the boiler.

More details gas boilers should be promptly after use as a factory price commercial 10t steam boiler plant drainage, heating, bath with gas boiler is a kind of fuel for the gas equipment (fuel gas-fired boilers), because it is compared with oil-fired boiler, electric boiler up more economical, which is widely used. After carrying out the gas boiler must turn on the water to be disabled. Why is that? We will come and detailed discussion about this issue today. To turn on the water when the gas boiler is disabled: gas boiler in the boiler water if the winter will put the cracking, there will be odor and summer long embroidered, so that the life of the boiler will be reduced. At the bottom of the boiler there is a turn on the water with the section of the door, then opened, gas boiler pipes in the water will flow back to the boiler, the boiler is done and the water on it. Water level controller SZB-IV (electrode type water level alarm) 1. When the normal level of + 30mm, pump control switch contacts are open, the pump stops working. 2. When the normal water level -30mm, pump control switch contacts in contact, the pump starts to work. 3. When the normal water level of + 50mm, a first group of electromagnets high gas boiler water level contacts the combined output high level alarm signal. 4. When the normal water level of the gas boiler -50mm, a second group of electromagnets in conjunction with the low water contact output low water level alarm signal.

In the fierce competition in the market, fast boiler adhere to "not forget the early heart, sustained ingenuity" of the faith, taking the long view, establish and improve a comprehensive overall solution, leading to control market trends, improve the environmental performance of the boiler, make unremitting efforts to build China clean boiler brand.

Gas boiler precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.