8t steam boiler Industrial Cheap Indonesia

There are more than 10 monitoring probes inside the boiler 2, in the event of abnormal starts immediately alarm system, a timely reminder to check the boiler fireman state.

3. PLC intelligent control system can achieve fast start and stop the boiler. By prompt on the operator interface, to complete startup, shutdown, and other adjustment operations.

Steam Boiler Manufacturers description boiler safe operation precautions 8t steam boiler industrial cheap indonesia is heating the water to a certain parameter and the production of industrial boiler high-temperature steam, the steam boiler manufacturers steam boiler belongs to special equipment, design, processing, manufacturing, installation and use must be accepted technical supervision department supervision, users only get to use the boiler permits to use steam boilers. So, in order to be able to normal operation of the steam boiler, we should pay attention to what matters it? (A) manufacturers introduced steam boiler, the boiler water level during normal operation should be controlled at one-half of the boiler water. Steam pressure may not exceed the maximum pressure of the boiler. Often pay attention to gauge indication, if found two pressure gauges differ by more than the atmospheric pressure, should be checked or replaced immediately reliable gauge. (B) the water level school often, not less than twice per shift erosion, as found leaking steam leakage should be promptly repaired, after flushing is complete, the water level should be controlled before it is consistent. Steam boiler manufacturers suggest that if the two have a water level gauge damage should be repaired immediately, as if the two also damaged, a short time can be repaired should strengthen the supervision of the low water level. If a short time should not be repaired shutdown for repairs. (C) once per shift soot blowing, increase the negative pressure of the combustion chamber soot-blowing. Often tour around the boiler, often pay attention to the relationship between the combustion and air flow plenum in order to control the degree of opening the door. Steam boiler manufacturer to alert the user if there is leakage case the door should be repaired immediately and listen everywhere without special sounds, which may be the furnace has water leakage and leakage, etc., should strengthen inspection. (D) Professional steam boiler manufacturers believe that each class schedule to clear the air chamber under paragraphs coal furnace leak, pay attention to whether the safety valve is reliable, whether there is something hindering relief work. Often pay attention to the operation of the grate, grate damage should be found immediately replaced. The lower grate to avoid fouling should not be too stuck grate. (V) to maintain the interior of the furnace heating surface cleaning and avoid the occurrence of water vapor poor quality foam cartridge phenomenon saturated steam boiler manufacturers that must boiler blowdown system. Boiler blowdown is divided into: a surface discharge, negative floating oily water accumulated in the surface of the furnace and other flying objects; continuous blowdown boiler water to eliminate alkalinity, to ensure that the amount of aqueous alkali delimited furnace furnace; steam boiler manufacturers reminder: to schedule sewage, often exclude the furnace of sediment. Chinese boiler manufacturing industry has made considerable progress, steam boiler can produce a variety of boiler manufacturers have different pressure levels and capacity. Boiler is a high-temperature, high-pressure thermal equipment, is one of special equipment, widely used in all walks of life. To ensure its proper operation, maintenance of the normal life of the boiler, steam boiler manufacturers indispensable reminder is: Boilers daily operations should be strictly in accordance with the requirements.

As a global boiler enterprise, Fangkuai Boiler attaches great importance to the opportunity of communication with customers. Therefore, we have set up a sales team of more than 100 people to visit customer units regularly to check the boiler operation status. Not only can timely search the customer's use feedback and boiler improvement opinions, provide a clearer development direction for equipment research and development, but also assist users in the testing and commissioning of boilers and maintenance work, full life cycle services, and solve customer cooperation projects. The problem is that nobody cares ".

1, the calculated blowdown rate: an index showing a blowdown blowdown rate, i.e., blowdown water blowdown rate (Q sewage) percentage of the amount of evaporation boiler (Q vapor) is. Expressed as follows: K = Q sewage / Q vapor × 100%. When the amount of the boiler water stable, balanced relationship according to the amount found that a substance with the water supply into the furnace equivalent amount drained waste water with an amount of saturated steam and entrained. The (Q dirt + Q vapor) × S a = Q vapor × S vapor + Q sewage × S sewage where S a, S vapor, S sewage represent the feed water, saturated steam, the content of a substance in the sewage water, in the formula S the value by the salt content, can also be a component of the content (e.g., alkalinity, chloride ion) is calculated. Sewage is K = Q / Q vapor = (S a -S vapor) / (S -S sewage to) × 100%.
2, blowdown rate is calculated to be noted that the following three points: (1) can be calculated blowdown rate alkalinity or chloride ions (chlorine ions and salinity have relatively fixed proportional relationship, usually replaced by chloride ion salinity) were calculated blowdown rate, whichever is greater final values ​​as blowdown rate, general heating boiler blowdown rate should be controlled below 10%. (2) for a large capacity boiler, because of its good effect of water separation apparatus, the humidity vapor is minimal. Such salt content is much lower than the saturated steam to water salinity, so in this boiler blowdown rate is calculated in both the salt content of the steam can be ignored, i.e., to K = S / (S sewage -S a) × 100% (3) for most industrial boilers, especially small volume of the drum, water separation device is simple, a large amount of water with saturated steam in industrial boilers, steam wetness often around 3% (control blowdown rate comparing the range of 5% to 10%, is already not too low) salt content can not be ignored when the 8t steam boiler industrial cheap indonesia blowdown rate is calculated under this condition. Since K = (S a -S vapor) / (S -S sewage to) = CL- to / (CL- -CL- to sewage) -CL- vapor / (CL- -CL- to sewage)