Manufacturers 8t Natural Gas boiler Energy Saving Nepal

IBR Small industrial manufacturers 8t boiler energy saving nepal in factory

IBR Oil or Gas Fired Boilers :

The 35 ton circulating fluidized bed manufacturers 8t boiler energy saving nepal in tetile plant belongs to the low temperature combustion, thus Nox emission is far lower than the pulverized coal furnace, only about 200 PPM, and can realize direct desulfurization in burning, high desulfurization efficiency, economy and technology and equipment is simple, the initial investment and operation cost of desulfurization is far lower than the pulverized coal furnace and flue gas desulfurization (PC + FCD).The discharge of ash activity is good, easy to realize the comprehensive utilization, no secondary ash pollution.

35 ton circulating fluidized bed boiler’s fuel wide adaptability and high combustion efficiency, particularly suited to low calorific value of inferior coal. The large range of load adjusting, about 30% of the low load to full load.

How to maintain the manufacturers 8t boiler energy saving nepal shutdown? After boiler shutdown cooling, heating surface must be thoroughly cleaned of fouling and ash grate the upper, the lower portion of the furnace. Then to maintain a certain degree of natural ventilation flue. In general, in order desiccant moisture should be placed in the furnace, flue. The quicklime as a drying agent, within the furnace or flue gas per cubic meter should be placed generally about 3kg. After placing all the ventilation should be tightly closed doors. After the change of lime powder to be replaced. Low-lying position as boiler room, ground during shutdown severe flood tide, often approach should be used and placed a small fire to dry desiccant combination. How to care? If the boiler shutdown a long time, the boiler shutdown after complete removal of soot coated with an anti-corrosion red lead paint in oil or other metal surface furnace. As internal corrosion Maintenance shutdown of the boiler body, under normal circumstances, can be used wet shutdown maintenance is not more than one month, one month electrically operated steam boiler should be taken to dry more maintenance. To note the following problems when a dry maintenance: desiccant boiler not in direct contact with the metal surface, may be mounted in a container such as the iron plate after the desiccant is placed, and a hole for shutting the other hand hole cover.

Exhaust gas has been plagued by sewage paper industry, paper industry pollution problems of the country very seriously. Fujian Heng paper packaging company has been committed to the use of clean-type manufacturers 8t boiler energy saving nepal paper processing. October 22, 2016, David Carse, the paper with my company, signed a 6 tons of steam an integral condensing steam boiler for the production of corrugated cardboard and other paper products. I provided the boiler greatly solve the problem of sewage wastewater Heng paper. After the boiler operation, both to meet local environmental requirements, but also reduce operating costs for the constant boiler paper products.