szs 1 6mpa oil fired water boiler with gas burne

We learned that recently, the city of Wuwei in Tianzhu county government announced that it will carry out a comprehensive coal-fired boiler demolition "clear" action aimed at remediation efforts to increase coal-fired boilers, and resolutely fight pollution control tough fight, complete coal-fired boilers out of the grid, clean energy transformation of the task of governance and compliance. The task of governance staff, shimenzhen government, Hua Temple town government organization done by the Bureau of Wuwei City, the ecological environment will Tianzhu Branch, and Hua Temple shimenzhen government and town homes for the elderly failed fork Station coal-fired boilers were concentrated tear down. To continue to improve the air quality of the environment, protect the health of the people made great contributions.

Tianzhu County will further promote the comprehensive improvement of coal-fired boilers, and through the elimination of the demolition, clean energy transformation, environmental compliance management, etc., with the completion of the internal area of ​​coal-fired boiler remediation tasks, achieve discharge standards in all coal-fired boilers. Meanwhile, the industrial park central heating, phasing out central heating, and for 10 tons of steam coal-fired boilers in the gas pipeline network coverage.

Up to now, Tianzhu County by incorporating central heating, clean energy transformation, compliance management, has completed the renovation of 74 coal-fired boilers. The remaining four coal-fired boilers in Tianzhu Force has developed a program of clean energy for heating reconstruction project, planned in June renovation, completed in August.

Matters needing attention in loading and installation of Gas-fired Steam Boiler

Gas-fired steam boilers are a very wide range of special equipment, usually built in boiler rooms. However, in the process of loading and installation, some problems must be paid attention to, otherwise it may cause a certain degree of economic loss.

1. Pay attention to the following matters during the loading and unloading and handling of gas-fired boilers: the lifting capacity of the lifting equipment should match the weight of the lifting boiler. The lifting lug on the boiler with the lifting lugs that cannot be used for lifting can not be used for lifting. The length of the steel cord should be reasonably selected to avoid the scratching of the furnace due to the improper length of the steel cord. The boiler must be protected from any damage during handling and handling.

2. Reserves for maintenance space When installing boilers, ensure that there is sufficient maintenance space around the boiler.

3. Setting and precautions for the base and base of the gas steam boiler The boiler body must be installed on the basis of 100-150mm above the floor of the boiler room. It must be confirmed with the technical personnel of the boiler manufacturing company in advance and constructed according to the basic drawings. The anchor bolts must be reserved on the foundation. The foundation shall be capable of withstanding the maximum weight of the boiler and the amount of water it holds. When installing the base, you must first position it. After positioning, adjust to the same length of the two diagonals of the base, and then tighten all the fixing bolts. The installation of the base is carried out with reference to the reference line.

4, general precautions Be careful not to tilt and impact the boiler and accessories too much. No combustibles can be placed around the boiler. Do not use oil and water to smother the boiler. The boiler should normally be installed in a separate boiler room. The new gas-fired boiler room should not be connected to the house. The boiler room shall not be connected to Class A, Class B and Category C fire hazard rooms using flammable liquids. If connected to other production plants, the application firewall is separated.

What are the reasons gas steam boiler popular? What is the reason gas steam boiler is popular? 1: the use of more environmentally friendly cleaning gas steam boiler. Gas hot szs 1 6mpa oil fired water boiler with burne with environmental protection, energy conservation, safety, salient features fully automatic operation, and ease of use. In addition, due to the operation of the economy, government policies to encourage, gas hot water boiler more and more people of all ages. Biomass boiler categories: biomass boilers Horizontal, vertical biomass boilers. Biomass gas thermal oil heaters, biomass steam boiler, biomass hot water boiler, biomass oil furnace. Gas-fired steam boiler burner underlying mode, two-pass configuration, the fuel combustion, the boiler operation is stable and take up less space, while the spoiler is inserted smoke tube, smoke slow speed, increase heat transfer, a high thermal efficiency, reducing users enjoy the reputation as the cost of natural gas is a clean fuel, do not emit harmful gases and soot in the combustion process. Therefore, do not pollute the air and the environment. Soot or carbon dioxide generated by conventional coal-fired boilers not only affect the air quality, but affect the health. Therefore, the use of gas steam boilers are environmental requirements. 2: high thermal efficiency of the reaction gas used in the thermal efficiency of the steam boiler is faster than the reaction of other aspects of the boiler, because natural, natural gas is used as a pollution-free high heat of combustion of the fuel, the higher the fire, heat faster switching speed, steam from the water pot and continue to release the faster. Compared with other coal-fired and oil-fired boilers, thermal efficiency is the fastest, most effective. Third: run more intelligent gas steam boiler does not require manual operation, does not require complex operational intelligence Zidongkongzhi whole process. All the work process only requires prior set all the parameters you can use. Gas steam boiler design according to user requirements, start, stop, automatically adjust the water supply load. Occur during operation of any abnormalities can also achieve self-diagnostics, interrupts combustion, sound and light alarm.

How do I care after the steam boiler shutdown method Recently, many users did not know how to call maintenance shutdown after steam boilers, boiler maintenance is very simple in fact, today we explain the steam boiler and hot szs 1 6mpa oil fired water boiler with burne after shutdown maintenance. Since the cause of boiler failure or power shutdown required boiler, a steam boiler before travel should stop combustion boiler, the boiler slowly lowering the temperature until no pressure boiler, should pump before shutdown, induced draft fan and turn off the blower. After the maintenance shutdown home for boiler, furnace divided into external corrosion and home for the pot. Pot corrosion enjoying, enjoying their home for two kinds of wet and dry selected based on the length of shutdown time. When long-term disabled boiler, furnace should be paid close attention to external corrosion problems take care of themselves. First, the boiler shutdown cooling is necessary as far as possible completely eliminate fouling and ash grate heating surface of the upper, the lower portion of the furnace. Then have to adhere to certain natural ventilation flue. Under normal conditions, should be placed to dry moisture-proof agent in the furnace, flue. The dry quicklime as used, the furnace or the flue gas per cubic meter of ordinary should be placed about 3kg. After placing all the ventilation should be tightly closed doors. Lime powder to change after change. Such as boiler rooms in low-lying position, the air during shutdown severe flood tide, the method should be used regularly and placed a small fire to dry dry agent phase separation. If the boiler boiler long time, in order to thoroughly clean the soot topcoat red lead oil furnace or other metal surfaces in the anti-corrosion paint. As for the way home for corrosion inside the furnace shutdown, the shutdown Yaoan the length of time to be. Under normal circumstances, no more than one month shutdown of the available wet home for a month or more should take care of themselves dry. Dry to pay attention when enjoying the following questions: Do not dry agent in direct contact with the metal outer boiler, can be housed in a container such as an iron plate; dry agent after standing, for shutting the hole and the other hand hole cover, the vapor, the water pipe necessary to cut off valve; variant lime powder should be replaced. . Enjoying while wet, to pay attention to boiler water condensate is preferably used, followed by the available existing boiler water, demineralized water again; after adding the base, with a slow fire boiler water is heated to 80 [deg.] C the pressure rose to 100 0.2 when the 0.3MPa to maintain 2-3 hours, alkalinity boiler water circulated reach equilibrium, reduced pressure, then filled boiler water, a certain gauge, and continue to adhere to this pressure throughout the home for, alkalinity should Regular testing, decreases should be added at any time; in winter, wet enjoying pay attention to antifreeze, especially the local sewage channel and economizer; before re-use should release all the pot boiler lye, best prepared sump, in order to facilitate then. At the same time should be rinsed with clean water.