papermaking gas steam normal pressure water tube boiler dealer

Select steam papermaking steam normal pressure water tube boiler dealer fuel gas of good or good? Steam boiler has a lot of varieties, the most common classification is based on it can be divided into fuel to burn natural gas and electricity and fuel burn of. When buying a steam boiler, a lot of people do not know that we should buy natural gas or fuel steam boiler steam boiler. Gas boilers and oil boilers are our two most common ways the boiler. If you want to use natural gas steam boiler, the need to ensure that there are local gas can be switched on; if you want to use oil-fired boiler, the procurement needs daily oil tank and oil tank buried, placed in position and good design, so that the fuel supply to the boiler. Gas-fired boiler burning natural gas, it has the primary energy saving, high thermal efficiency strengths, oil-fired boiler burning diesel fuel is light, it has a simple fuel reserves by the fuel supplier strengths affect small. The primary operating costs and fuel gas steam boiler steam boiler related with local energy pricing. Per ton of steam vapor is about to use the side 80, if the offer by gas 3 yuan / square to count, that is, 240 / ton operating costs. Steam per ton of about 66kg of light diesel oil is used, if the press 9 yuan / kg fuel offer calculated, then the cost of steam is about 594 yuan / ton. To compare quotes from the fuel, then, natural gas will be cheaper than oil. Free fast boiler thermal monitoring subject device a continuous steam boiler feedwater automatic control system Introduction

Our company attaches great importance to the quality of wine, winemaking process steam requirements provided very strict, party fast papermaking steam normal pressure water tube boiler dealer provides fully meet our needs, give us a brewery to provide strong support. --customer feedback

How to use cheap coal-fired papermaking steam normal pressure water tube boiler dealer, gas boiler and hot water boiler: gas steam boiler burner underlying mode, two-pass configuration, the fuel combustion, the boiler operation is stable and take up less space, while the spoiler is inserted smoke tube, slowing exhaust speed, increase heat transfer, high thermal efficiency, reduce user costs of coal-fired boilers, gas boilers, to achieve environmental protection, energy saving effect. Dust content of exhaust gas can be reduced by 30% to 40%. Mounting position: the oil pump is mounted between the nozzle and the combustion chamber or the ambient temperature should not exceed 360 ℃. Combustion apparatus exhaust gas discharged air pollution is greatly reduced. An exhaust gas of carbon monoxide (CO), nitrogen oxides (NOx), hydrocarbons (HC) and other harmful components greatly reduced, harmful exhaust gases reduced by 50%.

Gas papermaking steam normal pressure water tube boiler dealer precautions required during installation methods, or steps :( a) a foundation base of the boiler should be provided is determined according to the local soil, manufacturers design reference by the civil sector again. After reaching the base strength boiler, the boiler should drawings inspection and acceptance, and to draw the whole boiler three reference lines: a, longitudinal reference line - drum center or the center of the combustion apparatus. b, lateral reference line - the center of the front axle or chain grate slag centerline of the machine. C, elevation reference line - can be selected from a number of locations about four weeks, respectively, on the basis of the marking, the relative offset between the markers should not exceed 1mm. Furnace in place. After assembly the lower part of the boiler in place first, then the upper assembly large, the upper and lower portions need to find a combination of two positive pads firmly, should be both inside and outside the two casting. Installation location and size deviation test methods according to GB50273 "boiler installation engineering construction and acceptance" implementation. (B) lifting the boiler, during lifting, should be suspended on a lifting lug drum boiler ready large, the boiler on a foundation base coincides with the pre-drawn reference line. The longitudinal centerline of the boiler and the foundation, the deviation is not more than 3 mm, and the inclination with the center line of the drum hammer correction, allowing the central drum inclination is not larger than 5 mm, otherwise use horns foundation base and the junction pad level. Maximum level (c) Installation of boiler network (1), water supply conduit installation requirements typically require as backup pool below the normal water level line of the boiler, so as not to shutdown, boiler feedwater flowing into a large number of drainage caused to start the next . At the outlet of the tank (i.e., an inlet feed line) should be installed wire screen. (2), a main steam line installation requires the main steam lead pipe straight run section should be more than 0.5 m, the bending radius should be 4-5 times the diameter of the pipe, the trap should be fitted at the lowest line in order to prevent water hammer pipe, while to be reliable insulation. (3), the safety valve should be installed in the valve installation requirements after the hydrostatic test, the safety valve shall be fitted exhaust pipe, the exhaust pipe of the safety guide outside the boiler house, allowed valving the exhaust pipe. (4), mounting a lower water table level table downcomer must access a safe place, Hancock rotating flexible water table, not leaking, water table must be installed to the lighting device, easy to observe. (5), a pressure gauge mounting means so that when the scale gauge vertical plates, should be painted red gauge scale to show the maximum allowable pressure boiler, rotating flexible plug gauge, not leaking, water flow, pressure gauges insulation prohibited. (Iv) the boiler chimney installation requirements, when lifting the chimney, the chimney should be straight, horizontal direction lead length should not be too long, generally less than 5 meters, the height of the chimney should comply with relevant national standards. To add chimney rain cap, the weight of the chimney should not fall directly on the boiler chimney take over the host. Installation (e) combustion system: 1, according to the combustion system of FIG power line control circuit, a control signal line and the control line is electrically connected, the program should be installed reliable ignition and flame failure protection devices. Combustion process controller provides a separate set of contact start-stop control. May be formulated in a variety of burner start-stop loop cascade control relay 10A is a fuse, relay start-stop control stops the control terminal may be connected to the burner, may directly control the power of the burner. Both constant pressure sensor, water power, fuel, gas pressure set value is detected after the automatic controller opens. Time pressure sensor, water supply, oil, gas, and their detection circuit, alarm and found the problem immediately shutdown flame protection, the controller automatically displays the point of failure, an alarm sounds machine.