boiler 2t Commercial Fully Automatic Brunei

August 21 this year, is located in Tai'an City, Shandong Province People's Government issued the "Tai'an City 2018-- 2020 coal consumption reduction alternative work" (the "Program"), "plan" put forward the goal: by 2020 the city's coal total consumption control in less than 16.85 million tons.

"Plan" indicated, coal and other industries to promote the advanced production capacity instead of backward production capacity, optimize the layout of the coal industry, shutting down and eliminate small coal-fired boilers. Upon completion of the city's 10 tons of steam per hour and cleared of all coal-fired boilers, the city and county levels, no new urban area per hour and 35 tons of steam coal-fired boilers; 65 tons of steam per hour and higher fuel coal boiler completed the transformation of energy-saving and ultra-low emissions, reduce coal pollution, speed up the heating pipe network construction to expand the scope of central heating. Actively expand the consumer market in natural gas, fuel structural adjustment, encourage the development of direct supply of natural gas to large users to promote key industrial enterprises, industrial parks to achieve direct supply of natural gas. By 2020, natural gas consumption in the proportion of energy consumption increased to about 7%.

It is reported that the city will strengthen the clean-up before 2017 and shut down illegal projects, energy regulation and elimination of backward small boilers, small thermal power production, and resolutely prevent their return to work to resume production. And optimizing the layout of the coal industry, in strict accordance with the State-owned power plant deploy clean up illegal construction, and resolutely shut down coal units do not meet behind environmental protection, energy consumption, safety and other requirements. Meanwhile, on the basis of improving industrial enterprises above coal consumption data networking direct reporting system, increase audit statistics and law enforcement, and strengthen the quality of statistical data management, improve the accuracy and timeliness of coal consumption statistics.

Application examples steam boiler 2t commercial fully automatic brunei and steam boiler valves of the type of boiler, we understand it's on, the following will continue to be, its main contents, it is to answer the question, which specifically is: both sides of the coal-fired steam boilers than the middle of a large fire, what are the reasons? How steam boiler for hot water heating? And, in the steam boiler, the type commonly used in valve What? Below that, one by one specific answer it. 1. large coal-fired steam boiler fire on both sides than the middle, what are the reasons? If the problem occurs in coal-fired steam boiler, then the specific reasons are as follows: One reason: after the boiler coal seam, this time should be adjusted appropriately. Two reasons: the following grate boiler silos, there was congestion and other issues. 2. How steam boiler for hot water heating? This, then is transformed into the system involves specific practices thereof, for: the use of steam generated by steam boilers, to heat water in a heat exchanger. Then, the heat circulation pump, the hot water flows generated through the duct, for heating thereby. 3. In a steam boiler, the type commonly used in valve What? In the steam boiler, which is commonly used in the valve, the main valve is turned off, the ball valve and drain valve. Further, for the boiler feed water system also has some pipeline valve, such as safety valves. As for the valve of the emptying valve, not how to use. For steam boiler, it can be said above all their knowledge in the system, so to all of us, is the need to know and a firm grasp of. Because the only way we can gain from and progress, and at the same time, so apply their knowledge, so that should reflect the knowledge of its valuable.

What forms of chemical plant boiler 2t commercial fully automatic brunei inspection there? What forms of chemical plant boiler inspection there? Or organic heat boiler uses water as the medium pressure vessel was heated by a flame or electric heating, and multi-output heat to steam, hot water forms, during operation of boiler, the furnace member at a high temperature and pressure, or external temperature flame radiation, may occur wear, corrosion, distortion, scaling, and other defects over-burning, ash plugging may also occur, slagging phenomenon. More serious will lead to burst pipes or explosion and other accidents, if not timely detection to eliminate them, will eventually lead to loss of life, damage to equipment, to bring social unrest, cause losses to the state and enterprises. Check the boiler is a boiler to minimize the risk of the task. Boiler Inspection generally divided into boilers and boiler Supervision, Inspection and periodic inspection, the former is an integral part of the normal operation of the boiler in a test, divided into internal and external inspection test boiler boiler; the latter is mainly for boiler installation, alteration, major repairs an extremely important test carried out. 1, chemical plant boiler regularly inspect boilers periodic inspection refers to the periodic inspection of boiler inspection rules for safety and energy savings boilers carried out according to regular inspection prolong the service life of the boiler, including external inspection running under the boiler, boiler stop internal inspection and hydrostatic test under the operational state. External inspection cycle once a year; internal inspection period is every two years; the boiler because of structural reasons can not carry on in the inspection, hydrostatic test should be carried out, for the period of 3 years. Including internal content inspection for cracks, cracks, corrosion, scaling and other defects on the drum, boiler shell, superheater, airway pressure receiving member and the like; the same shall be the time when the problem occurs in the last test specimen methods for review. External inspection tests generally include the following elements: operation of the boiler external environment and load-bearing device, an external boiler piping, safety accessories and safety devices, auxiliary equipment. For external examination of organic heat carrier boiler, acidity should review inspection reports and records, kinematic viscosity, carbon residue, water and other indicators of compliance with national standards, to check its compliance with safety devices regularly boiler inspection rules. 2, Boiler Inspection Boiler Inspection supervision include chemical manufacturing supervision and inspection of boiler and boiler installation, alteration and major repair of supervision and inspection. Supervision and inspection methods commonly used data review, physical inspection and on-site supervision methods. When data review should be strictly regulated in accordance with the pot; when the inspection site monitoring, supervisory inspector should be carried out in accordance with the relevant system standards, to comply with the relevant safety specifications; when physical examination, in general, checks manner. Supervision and inspection of the boiler by the degree of impact on the safety performance of the boiler can be divided into A, B, C categories, followed by a significant impact, greater impact, the general impact. Former chemical plant boiler supervision and inspection, the following should be inspected units do a good job, ready to license within the validity period (but without permission or license application has been accepted); develop plans to submit construction plans or production supervisory agency; provided the necessary supervisory inspection work conditions.

In many fuel gas-fired boiler 2t commercial fully automatic brunei, we will find that there is one called "explosion door" part, usually installed in the furnace side of the furnace wall, or the top position of the furnace exit flue. Well, I have not thought about this explosion-proof doors installed on the gas boiler, what role do?