combined gas fired water tube boilers in Oceania

The capacity of the combined fired water tube boilers in oceania is also called the output of the boiler. It is the basic characteristic parameter of the boiler. The steam boiler is expressed by the evaporation amount, and the common unit is ton/hour (t/h). Hot water boilers are expressed in terms of heat, in megawatts (MW). The hot water boiler produces 0.7 MW of heat, which is roughly equivalent to that of a steam boiler producing 1 t/h of steam. ZG boiler produces oil and gas boilers with different capacities, which indicate the rated output of the boiler, that is, the evaporation or heat supply under normal working conditions when the boiler is in continuous operation for a long time.

Industrial gas steam combined fired water tube boilers in oceania room planning considerations: industrial gas steam boiler room Planning Considerations What? Followed by the degree of technological progress from time to time, the rapid expansion of social economy, people's requirements for industrial gas boiler room planning have become more sophisticated. Now now, in the industrial gas boiler room planning there are still many achievements in urgent need of treatment, therefore, we have to enhance the learning and use of advanced planning practices and advanced technology, from time to time suspend the development and review of industrial gas boiler room planning, the industrial gas boiler housing plan is more suitable, safe, reliable and economical. 2, selection and use of industrial gas boiler at a reasonable selection of urban planning, boiler, environmental management and other mission boiler type is dropped purification, waste power, an important part of reasonable expenses. Set the cost of the boiler is one of the essential elements of when thinking of selection. Because the characteristics of industrial gas boiler itself, the boiler room and equipment to establish a more economical, should be used in high load industrial gas furnace heat boilers in order to reduce the volume of the furnace. Due to the absence of heating surface cleaner, slagging, wear results, the smoke may use a higher speed, reduced scale of the convection heating surface, convection through the rational placement control the industrial gas boiler capacity of coal-fired boiler with a more compact structure, dimensions small, light weight, in order to decrease equipment investment; supporting auxiliary boiler optional satisfactory work. Industrial demand for gas-fired boiler is not equipped with soot blowers, dust, slag and other equipment and fuel dryer slave device, and can save and land acquisition costs placed above equipment; the use of a gas pipeline walks as boiler fuel, not only no fuel storage equipment, supply calm and without prior preparation of fuel processing equipment, greatly simplified the trivial; civil engineering boiler room investment costs and other related costs will lower; no fuel storage, can save shipping costs, place and rest force. Boiler room non-essential equipment such as leak detection equipment for the surge equipment, measurement equipment, gas. Coal, oil, gas boiler three kinds of heat load in the opposite situation, a huge volume of coal-fired boilers, additional slack style drums, Fan, Java machine, dust collector, but also with storage of coal, slag heap place, It covers an area larger. Industrial gas boilers small volume itself, and these need not be equipped with auxiliary equipment, simply set up between a host and auxiliary room, set on more messy, covering economy. Industrial gas boiler city gas source is generally taken from the intermediate pressure gas supply line, the gas pipeline laying gas sampling point to the boiler room, then according to quell's brand, type and caliber regulating device applications, scheduling outlet pressure range, by metering the put into use. Establish a set fee just gas network tariffs, pipeline fees, hot walks pipeline fee. Gas pipeline network overall cost of capital is the sum of the gas company funds charged to the user, it can be determined depending on the circumstances around the gas company. Usually adopted buried gas pipeline type, buried depth is generally about 0.8m ~ 1.0m, seamless steel pipe can be selected or PE pipes, pipe surrounding sand 15cm ~ 20cm plating, hot water pipe laying relatively simple, somewhat messy steam pipe walks . 3, industrial gas boiler room planning results in the presence of 3.1. Selection of the size of the heat load of the boiler and its expansion tend to choose the boiler capacity, the number of great links. The larger heat load, single boiler capacity should be large. The near future can be greatly increased thermal load, it is also relatively large capacity boiler can choose, it will expand the load thought. The only thought to increase the long-term thermal load, the expansion device may leave the boiler placeholder deployment end in the boiler room, or space left on the total FIG. However, in the practice of project planning, often there is a lack of expansion heat load estimates, constitute improper boiler selection, pre-operation to cause unnecessary trouble. 3.2. Gas boiler gas regulator trivial results generally used in high-pressure (less than 5kPa) and medium voltage (5 ~ 150kPa) trivial. Gas usually before entering the boiler room will arrive this requirement. Now the gas hot water boiler is equipped with a high level of automation subsided, a calm requires the gas pressure is lower, so before further demand into a calm pace pressure boiler manufacturers themselves generally equipped. Gas pressure regulating trivial demands reliable equipment, but on the size of the gas pipeline valve is open due to the gas pressure when scheduling the gas pressure is high or low, and tempering will cause off, start and stop frequently subsided's configuration, thereby affecting the boiler work. 3.3. Gas boiler quality results planning standard gauge, the quality can not be ensured when the gas, should be provided or dust, oil and water, respectively, and a total closed drain valve before the gas main pipe before the regulator device. Most of the oil production plant in the use of oil with anger, it is often said of moisture in the summer cold weather, moisture and light hydrocarbons and other substances containing moisture, condensation will constitute a line blockage, an initiative to quell the flame, impact Heating. 3.4. Chimney condensate results because of the high thermal efficiency of industrial gas boiler, a low exhaust gas temperature, typically 180 degrees, the boiler room planning criteria (GB50041-2008) rules industrial gas boiler room chimney should be reinforced concrete or steel chimneys chimney. Chimney will appear directly in the outdoor summer steel chimney condensate freezing results, constitute icing light rusty steel chimney, would constitute a temporary corrosion, freezing severe affect chimney smoke. 3.5. The amount of air to quell the outcome's when quell Industrial gas boiler is in the boiler room, the air between the boiler must be satisfied the requirements apply to quell the device, otherwise there will be no abundant natural gas to quell working carbon monoxide poisoning.

After the fuel oil is sprayed into the furnace, it is very easy to mix with air and burn rapidly and exothermic rapidly. Compared with the coal-fired combined fired water tube boilers in oceania with the same parameters and capacity, the thermal strength of the furnace volume can be doubled to 1046.6 × 10 kilo coke / m / m ·h. However, in order to reduce the heat load in the combustor area so as to avoid the overtemperature of the water wall tube in this area, the furnace volume is only reduced by about 1 / 3. Because the ash content in fuel oil is very little, it can not form slag on convection heating surface, so the flue gas temperature of furnace outlet can be up to 1300 ℃, and the pitch between tubes of convection heating surface can be reduced to increase the flow rate of flue gas, so as to increase the flow rate of flue gas. Heat transfer coefficient of heating surface, saving heating area and steel.

In early November, Luyi County, Henan Province Quality Supervision Bureau organized a safety inspection activities on the combined fired water tube boilers in oceania in the area, ensure the safe use within the jurisdiction of the boiler in winter.

The main focus of inspection units use boilers to see through the following points:

First, the use of registration, maintenance, periodic testing situation.

Second, the establishment and implementation of the system and the rescue plan.

Third, if the boiler worker certificates.

Fourth, the operation of the boiler water treatment facilities.

To date, Luyi County Quality Supervision Bureau has complete supervision and inspection work on 11 units in the boiler, the inspection found problems and risks, monitor the instruction issued according to the law, clearly boiler rectification matter and time.