Commercial 6t gas steam boiler Price Cambodia

10tph SZL coal-fired water tube boiler project for edible oil industryA commercial 6t steam boiler price cambodia is the essential equipment for the production line of edible oil, providing steam for manufacturing processes including impurity removal, drying, decoloration and filtration. Chitral Oil & Ghee Industries (Pvt) Ltd., established in 2004, is a large oil enterprise. Its main products are cooking oil, edible oils, vegetable vanaspati and industrial fats. As the consumption patterns are changing in Pakistan, the demand for edible oil is growing day by day. The government of Pakistan strongly called on meeting national demand by increasing domestic production. Chitral Oil & Ghee Industries (Pvt) Ltd. seized the opportunity and planned to introduce several more production lines. The technical team from the company conducted in-depth exchange with ZOZEN's engineers to ensure the steam boilers' high durability of quality and performance. The company fully affirmed ZOZEN's advanced and professional manufacturing technique and ordered several sets of 10tph SZL series coal-fired water tube boilers. This kind of water tube boiler has wide fuel adaptability; in addition, it is equipped with independent wind barns to distribute wind according to the different combustion conditions; chain grate layer burning ensures the full combustion of fuels. ZOZEN also customized the feeding system, mucking system and tail flue gas processing system for the company, which would effectively improve their economic benefits.

Cade Shopping Mall is located in central Shanghai Hongkou District, Shanghai Daily larger flow of people in the region. The introduction of Shanghai air pollutant emission standards, boiler flue gas emissions of nitrogen oxide emissions to less than 80 mg / m, Shopping Mall a coal-fired boilers have been used for many years, NOx emissions far super to this request, the urgent need to replace more environmentally friendly low nitrogen emission boilers. Other units through the use of fast Boiler introduction and understanding, determined and fast boiler to achieve cooperation, party fast to their specific needs to recommend one condensing gas hot water boiler of a 4.2MW for heating needs of the shopping center.

Gas commercial 6t steam boiler price cambodia loading, installation considerations gas steam boiler is a very wide range of special equipment, usually built in the boiler room. However, its load, the installation process, some issues must be taken, otherwise it may cause a certain degree of economic losses. 1, the process of handling and transporting gas in a steam boiler to be noted the following: the lifting capacity of the lifting device should be matched to the weight of the boiler Lifting. Can not be used for lifting has a length marked with a lifting lug can not be used should be chosen on the boiler rope, rope length to avoid inappropriate, leading to scratching furnace. In the loading, unloading and handling process must ensure that the boiler without any damage. 2, installation of boiler maintenance reserve space, make sure there is enough space for maintenance around the boiler. 3, the base gas steam boiler, the base of the boiler and precautions to be installed on the basis of 100-150mm above the floor of the boiler on the premises, subject to prior confirmation boiler manufacturing company with technical personnel, in accordance with the basis for construction drawings. Must stay out of anchor bolts embedded hole basis. Foundation must be able to withstand the weight of the boiler and the largest holding water amount. When the mounting base, must first be positioned. After the alignment adjustment in the end the length of two diagonal lines of the same base, then the entire tightening the fixing bolt. Base mounting reference line marked for reference. 4. General Precautions Be careful not to tilt too boilers and accessories and be impact. Can not be placed outside the boiler fuel. Do not dirty oil and water boilers should generally be installed in a separate boiler room, the new gas steam boiler room should not be connected to the house. A boiler can not be connected, (B) and (C) use of flammable liquid fire risk room. If the production plant is connected to the other, separated by a firewall application. 5, fire resistance rating of the boiler room of the building and fire safety requirements should be consistent with "architectural design code for fire protection" and "design of tall buildings for fire protection" requirements. Gas-fired steam boiler room on the ground should be smooth, non-flammable, no water, load-bearing foundation should meet the requirements. Gas-fired steam boiler supply voltage should be stable, to avoid burn electrical components. The voltage instability, is recommended to install regulators. To set the boiler room ventilation equipment, to maintain the boiler temperature at 50 ° or less.

2 t 2 t introduce gas boiler gas boiler burner arranged good technical performance, the use of automatic combustion ratio adjustment, automatically adjust the water supply, the program start and stop, automatic operation and other advanced technology, and having a low water level and low level alarm, high . steam pressure, turn off automatic protection function of the boiler has a compact, safe, reliable, simple, rapid installation, low pollution, low noise, high efficiency features: 2 tons of gas commercial 6t steam boiler price cambodia with a leading domestic level, and industry compared to the same parameters of the boiler, with a compact, power, fast boosting, high thermal efficiency. Advantages: use all wet back shell type pyrotechnic tube structure. This structure because of its compact structure, small footprint, originally applied in the marine boiler. This architecture uses three return, the oil mixed with air or gas well through the atomizing burner, complete combustion in the furnace in a corrugated, folded from the rear chamber into the first tobacco smoke return pipe to the front smoke box to the second return pipe tobacco, cigarette box, is discharged after the last to enter the chimney.