Energy Saving Seller hot water boiler 2t Vietnam

Cheap steam boiler good buy it? How Kunming steam boiler should be chosen? Now the boiler equipment, it can become a lot of equipment inside the factory to use, especially in winter comes, it is possible to complete the supply of heating and energy saving seller hot water boiler 2t vietnam by now, is to become a place that many will to use the device. So now the boiler applications is quite extensive, especially in the classification of the device can be started increased to meet the current needs of different industries use.

At the same time, there is a problem when the boiler, be sure to ask a professional service personnel to assist inspection and maintenance, do not in order to save a little maintenance costs and ignore it, so the result is often counterproductive, runs the risk of greater losses.

Jilin Province is located in northeast China, colder winter. Jilin Province is the autumn and winter air pollution problems are most acute period is the peak period of fog and haze. To reduce the frequency of occurrence of fog and haze, to reduce emissions of air pollution, according to "implement the central Jilin Province Environmental Protection Inspector feedback reform program", Jilin cities to carry out the 2018 autumn and winter special law enforcement inspection of non-electric coal-fired boilers. Specific implementation of the program as follows.

2018 autumn and winter non-electric coal-fired boiler special law enforcement inspection action plan

First, the objectives

Through the "2018 autumn and winter special law enforcement inspection of non-electric boiler coal" action to further increase the intensity of emissions of air pollutants such as excessive penalties for violations combat, urge local governments and environmental protection departments to effectively implement the "Jilin province to implement the central environmental protection inspector feedback reform program, "Forced enterprises to speed up 10 tons of steam coal-fired boilers small and out of more than 20 tons of steam and non-electric coal-fired boiler pollution control facilities upgrade progress to ensure stable discharge standards.

Second, the scope of the inspection

Cities (prefectures) and Changbai Mountain Administrative Committee, Meihekou, Gongzhuling City, Hunchun.

Third, check the time

2018 Nian September 1 to November 30.

Fourth, inspection methods and content

Cities (prefectures) and counties under the jurisdiction of Changbai Mountain Administrative Committee to set up inspection teams to units in the area to take a cross peer review mode, Meihekou, Gongzhuling City, Hunchun to self-oriented.

The principle of mutual cross-check on the environmental violations found, the city's environmental protection departments at all levels in accordance with "should check to make investigation, should make a fine penalty, should be moved to make-shift" of errant given time out of the boiler, not dust removal facilities renovation no construction of desulphurization facilities are not required to install, networking, using automatic monitoring equipment, excessive discharge of pollutants and other acts take full advantage of "environmental law" and supporting measures to implement daily basis penalties, limited production shutdown, sequestration, administrative detention measures to deal with.

Focus on examination of the following:

(A) the progress of 10 tons of steam coal-fired boilers little out of work. According to "implement the central Jilin Province Environmental Protection Inspector feedback reform program," according to the time limit set by local governments, the progress of the phase-out of coal-fired boiler 10 tons of steam since 2014, the province's illegal 1570 newly registered units to be checked.

(B) more than 20 tons of steam coal-fired boiler non-electric dust removal, desulfurization facilities upgrade progress, automatic monitoring equipment installation, networking, usage. By ShengTing 6, July scheduling, the current to complete the rectification stage 717, stage 108 does not start the rectification, the rectification is 277, automatic monitoring equipment table 140 is not installed, the slow progress of the rectification. To complete the transformation around the boiler on-site verification, focusing on inspection facilities dust removal, desulfurization facilities upgrading and installation of automatic monitoring equipment, networking, usage. Percentage being modified, check the current progress of the major transformation of the situation, progress of the project, the time frame for completion, safeguard measures taken, it requires the use of boiler units issued commitments. For failure to start the transformation, to identify the main reason for not starting. If we do not transform the way in which the pin number to take all necessary construction and renovation tasks must be completed in accordance with the requirements of 30 September.

(C) boiler emissions standards. To install automatic monitoring equipment to monitor them than to confirm the validity of the data. For failure to require the installation of automatic monitoring equipment, shall be punished in accordance with relevant laws and regulations, at the same time supervisory monitoring, to determine whether to achieve a stable discharge standards.

Fall and winter heating season is the peak of Jilin Province, to ensure the normal heating units, we must also pay attention to boiler problems in the process of environmental protection. For the high-emission, high-polluting coal-fired boiler and other fuel boiler, to be banned or corrective action.

WNS low nitrogen condensing gas water boiler WNS specifically describes a low nitrogen condensing gas water boiler WNS specifically describes a low nitrogen condensing gas water boiler WNS specific description low nitrogen condensation (built-in) of the energy saving seller hot water boiler 2t vietnam mature three times all wet back structure. Design and repair of large open front smoke box is very convenient. Large low-NOx combustion furnace full hybrid combustion, heat transfer efficiency threaded pipe technology. An outer loop of the principles of the flue gas (of FGR) or surface premix combustion technology were tested and tested. 30mg fully meet the low NOx combustion of nitrogen emissions standards, urban heating 30mg fully meet the requirements of low nitrogen emissions. WNS condensing hot water boiler furnace using a large full-wave oven advanced design concepts, general match reasonably low nitrogen combustion flame, it will reach sufficiently reduce the high temperature zone of the furnace combustion temperature, thereby increasing the effective control of NOx concentration, low nitrogen emissions fully meet government the requirements. Calculated by the spiral heat transfer screw principle and design perturbation simulated three-dimensional animation, the design of a small threaded pipe heat transfer efficiency, and high-quality seamless steel pipe it has a good heat transfer performance, low friction and long life. FGR invisible smoke outer loop assembly configuration, to meet the combustor 30 mg of low nitrogen emissions standards, with Siemens solenoid valve, control the flow of flue gas combustion itself recovery ratio according to the conditions, to achieve the desired low nitrogen emissions 30 mg. WNS tail low nitrogen condensate water boiler equipped with an internal condenser, all parts are laser cut, the cooling process, the sealing plate is made of steel ND, selection of low temperature corrosion of the spiral fin tube, in a limited increase transmission spa hot area. CE, fully absorb the exhaust gas, the exhaust gas temperature is reduced to improve the thermal efficiency of the boiler, the condensed water. Built-in fully occupy the space area of ​​the boiler room, a wide range. Before the use of double cigarette design double set of built-maze and the heat insulation layer, good insulation properties. Further, all-Q245R boiler plate as cigarette packets and the cover plate, CNC laser cutting technology for cutting steel sheet. Its small deformation, high assembly precision, good welding results. WNS low nitrogen condensate outer surface of the hot water boiler aluminum silicate carpet, insulation performance, high-quality cold-drawing an outer frame plate, NC folding bed processing. Strong concave front and rear plates is connected to the backbone pressure welding, a filler which is rectangular mosaic stuck assembly, the four corners are equipped with self-tapping hole, a decorative cover 304 for sealing, to facilitate repair, the overall appearance novel. Small heat loss and improve the thermal efficiency of the boiler.