3 ton oil fired steam boiler in pakistan

The development trend of environmentally friendly eco-friendly hot water boiler hot water boiler ushered in new opportunities. Late last year the State Council issued energy-saving environmental protection industry. Environmental protection boiler is also more and more attention in the boiler industry, in which major favorable policies, the mountain pot boiler seize the opportunity to develop environment-friendly hot water boiler, and its development trend did some summary for everyone to share now study and discussion, together with the conduct. The development trend of environmentally friendly hot water boiler specifically in the following areas: high-efficiency boilers; using simple auxiliary sets; simple structure; the whole intelligent automatic control and is equipped with multiple-level protection system. Environmentally friendly hot water boiler is on the whole have the following requirements: size and weight were reduced, which reduces the footprint of hot water boilers, boiler room would not need so much construction, weight reduction will saving materials, use of new materials to replace the old materials to improve the life of the hot water boiler, also during transport in many aspects, reduce unnecessary trouble. Improve boiler efficiency reduces fuel combustion, thus reducing the consumption of natural emissions of flue gas and water; and increase the degree of automation assembly, boiler maintenance so it will be more convenient, where you do not have the repairs carried out accessories and replacement is simple and convenient, automatic application of the procedures boiler with higher intelligence. Especially in recent years, the use of some new combustion technology and enhanced technology, the volume of oil and gas hot water boiler heat transfer is greatly reduced than before. Our industry has made great strides in development, people's general requirements of hot water boiler will be more stringent. This requirement is mainly to solve the contradiction between economic, security, usability. Mountains pot hot water boiler with a mature technical team, developed a hot water boiler in line with customer requirements for environmental protection, we have made many achievements in the hot water boiler market. Our mountain pot boiler satisfied with the existing results, as always, based on the market, focus on the future, to develop more high-quality environment-friendly hot water boiler, make a contribution to environmental protection. Gas boiler steam cleaning and maintenance measures combustion gas 3 ton fired steam boiler in pakistan is first opened the door, the rear housing panel removed, screwing the rear open boiler cleaning opening. Clean fuel gas piping with a wire brush. With a soft brush to clean the combustion chamber. Gas steam boiler to remove residue in the boiler, the cleaning opening is screwed on the screw, closing the burner door seal check is complete. If the boiler is installed in areas where temperatures below 0 ℃ must take the following precautions: If outside the boiler room, the room temperature drops below 15 ℃ or 18 ℃, the whole day operation of the boiler. If a long time no one in the room should be emptied of water in the boiler. You know cathodic protection of each member constituting the boiler (such as iron, copper, aluminum, etc.) of different materials. In order to prevent galvanic corrosion, cathodic protection measures must be taken. Sewage treatment boiler. The bottom of the gas-fired boiler flue gas emissions to prevent condensation. Since the flue gas is flue gas condensation (diesel or natural gas) and the flue gas temperature in the aqueous too low, water generated. A portion of the moisture is discharged from the chimney, the chimney wall is absorbed, the rest is deposited on the bottom of the chimney. Water produced by the following factors influence: flue gas temperature (efficiency 91%, the flue gas must be at a temperature of 170 ℃) where the total surface area heat chimney, chimney and chimney material. Maintenance of the burner. Gas boiler and burner maintenance, the best maintenance after steam supply. Because the products of combustion will corrode the boiler, clean up carbon deposits, therefore, not allow the products of combustion burner door opened first time in memory, leaving the boiler is too long, remove the rear housing panel, tighten the screws to open the rear side of the boiler clean mouth. Clean fuel gas piping with a wire brush. With a soft brush to clean the combustion chamber. Gas steam boiler to remove residue in the boiler, the cleaning opening is screwed on the screw, closing the burner door seal check is complete. If the boiler is installed in areas where temperatures below 0 ℃ must take the following precautions: If outside the boiler room, the room temperature drops below 15 ℃ or 18 ℃, the whole day operation of the boiler. If a long time no one in the room should be emptied of water in the boiler. You know cathodic protection of each member constituting the boiler (such as iron, copper, aluminum, etc.) of different materials. In order to prevent galvanic corrosion, cathodic protection measures must be taken. Sewage treatment boiler. The bottom of the gas-fired boiler flue gas emissions to prevent condensation. Since the flue gas is flue gas condensation (diesel or natural gas) and the flue gas temperature in the aqueous too low, water generated. A portion of the moisture is discharged from the chimney, the chimney wall is absorbed, the rest is deposited on the bottom of the chimney. Water produced by the following factors influence: flue gas temperature (efficiency 91%, the flue gas must be at a temperature of 170 ℃) where the total surface area heat chimney, chimney and chimney material. Maintenance of the burner. Gas boiler and burner maintenance, the best maintenance after steam supply. Because the products of combustion will corrode the boiler, clean up carbon deposits, therefore, not allow the products of combustion in the boiler stay too long memory

Recently, Xi'an, Shaanxi Province take minus coal, train control, dust suppression, government sources, prohibiting other measures, the air pollution caused by human factors reduced to very low, efforts to improve air quality in Xi'an winter. As of early November, Xi'an has cut 100 million tons of coal-fired, 15 high-ranked companies relocate or shut down.

In 2018, the Shaanxi provincial government issued a formal mandate to inform, Xi'an total of 140 million tons of coal to reduce the task, mainly around the Xi'an city government to cut electricity, central heating boilers Chaigai, urban and rural residents scattered coal and gas supply security in four areas of governance to carry out jobs. As of the end of October this year, has cut coal 1.015 million tons, completed 70.7% year plan. Built area of ​​29,419 catering units are the use of clean energy, outside built-up area 5196 catering units are to switch to clean energy.

Vehicle exhaust is one of the sources of atmospheric pollution. In order to strictly control the "black tail", environmental management staff at the three-ring along the line, passenger stations, farmers market, food stores and other black smoke high incidence of vehicle checkpoints set up 423-bit, low-speed vehicles investigated a total of 71,300 cases to go cut the line , black smoke car 7027 cases.

In the "anti-summer period", Xi'an continue to implement the motor vehicle limit line of control measures, and completed the 3255 update of pure electric buses put into operation, the completion rate of 102%. Newly started construction of public parking spaces 12,908, 86.1% completion rate. Investigate ChaoBiaoChe 3504.

In terms of the source rule, Xi'an cumulative Mopai "scattered dirt" Enterprise 21021 (including New West Ham), complete renovation 8163, completion rate of 38.8%; 15 high energy consumption, high emission enterprises to complete the relocation or shut down; 3399 Taiwan low nitrogen gas boiler to complete the transformation, the completion rate of 99.4%.

40 industrial enterprises complete control of volatile organic compounds, the completion rate was 88.9%; 26 224 restaurants and stalls point to install smoke purification facilities; 1259 spray paint auto repair business to complete in-depth treatment of exhaust gas, and all the installation of pollution control equipment independent meter; the Third Ring Road 336 gas stations outside the full completion of the transformation of tertiary recovery of oil and gas, and all the installation of pollution control facilities separate meter.

In terms of prohibiting, Xi'an completed summer crop straw comprehensive utilization area of ​​249.82 acres of mechanization, comprehensive utilization rate of 95.4%, exceeding the target task. At the same time, organized and implemented six acres and nine provincial and municipal straw utilization demonstration projects, compared with the provincial target increase of 12.5 percentage points; investigate and deal with the problem of black smoke burning from 457; 8 consecutive years of summer and autumn straw Jinshao to achieve "zero fire point" goal.

This year, the Xi'an handled a number of prominent air pollution problems. City of iron-fisted rule examination revealed a total haze to do all kinds of air pollution problems 1862, the city set up a team of 153 people to strengthen the supervision and inspection found problems common enterprise 6128, cross-check inspection found a total of 11,781 business problems. These issues are issued under the supervision of the list of issues to be reform.

Note the fuel gas-fired boiler fuel gas pressure when the talk about fire boiler shutdown in accordance with the fuel (electricity, oil, gas) can be divided into electric 3 ton fired steam boiler in pakistan, steam boiler fuel, gas steam boiler three kinds; in accordance with the constitution can be divided into vertical steam boilers, horizontal steam boiler, steam boiler, mostly small and medium sized single, double the return of the vertical structure, large steam boilers and more horizontal structure of three return. The following is a pressure Cautions fire boiler 1 shutdown, shutdown pressure fire more than 6h, main steam valve should be closed after the pressure of the fire over time, open trap superheater outlet header of the superheater to cool. After closing the main steam valve, such as pressure goes up, and can be used at the same time into the sewage Boiler Feed down method. When the recovery boiler operation, subject to step-up and step 2 protection, thermal shutdown during the press pot still steam pressure, it must still pay attention to monitoring, and to allow the boiler to maintain the water level 3, with a cast iron gas boiler province, in after stopping the boiler feed water, the shutter should be closed save flue gas, furnace bypass channel open flap or in the circulation pipe, stopping the gas temperature exceeds a predetermined value within the province 4, the pressure during the shutdown should be appropriate fire sewage, furnace exclude precipitation Care was taken after pressure fire shutdown should not immediately stop the operation of the circulating pump, the network should continue circulating water circulating in the system for some time, when the boiler outlet water temperature dropped to 50oC with the following, in order to stop the operation of the circulating pump

Henan daily operation of the gas boiler 1. Contact chemical maintenance, turbine attendant prepare enough desalinated water, oxygen, water passing temperature no higher than the drum wall temperature 50 ℃; Sheung during hot drum wall temperature should be , metal temperature is not more than 40 ℃. 2. After the new installation or repair before Henan Gas Boiler Feed recorded once ministries indicate expansion. 3. Sheung summer time less than 2 hours, at least 4 hours in winter, when the temperature and Sheung drum wall temperature difference of less than 40 ℃ 4. How Henan gas reheater boiler corrosion protection? (1) turbine playing gate , to ensure that a boiler blower, preferably a cross ID fan, two reserved oil gun. (2) open to the air reheater exhaust steam reheater hydrophobic air door and the door be preserved, to be preserved reheater predetermined temperature below 400 deg.] C for steam. (3) controlling the drum water level within an allowable range. (4) to ensure that the chamber negative pressure 50--100Pa, each of the flaps open, baffle for ventilation less than 5 minutes, stop sending, Fan, each of the flaps closed tailgate may be appropriate to accelerate Sheung speed.