Manufacturing Companies Commercial 6t Natural Gas boiler Bhutan

When the 40 tons SZS series gas and oil fired manufacturing companies commercial 6t boiler bhutan is running, the fuel enters the burner from the external air source, and automatically generates a high temperature flame through the automatic adjustment and automatic ignition function. The front end of the furnace enters the convection heating surface on the upper side of the burnout chamber, and then enters through the upper part of the front smoke box. the second part. The convection heating surface exits the boiler from the rear of the rear smoke box and is vented to the atmosphere. The saturated steam is generated by heating, and the working fluid is output from the main steam valve to the operating system.

You must know the manufacturing companies commercial 6t boiler bhutan energy problems (induced draft fan power consumption rate, steam consumption) draft fan causes problems 1.1 boiler flue dust and fouling, in particular air preheater fouling, resulting in increased resistance to smoke duct . 1.2 boiler flue, tail heating surface and dust leakage. 1.3 Leakage Rate large air preheater. 1.4 furnace excess air coefficient is too large. 1.5 unit load changes, run the adjustment is not timely, resulting in furnace pressure is too large. 1.6 unit load or low frequent starts and stops. 1.7 coal into the furnace worse, from the design value. 1.8 low efficiency filter. 1.9 draft fan blade badly worn, low operating efficiency. 1.10 fan outlet flue gas desulfurization big resistance. 1.11 soda boiler pipes for leaks. 2, 2.1 to 2.1.1 operational measures to solve the problem of the strict implementation of soot blowing system to prevent the heated area ash, blocking ash, flue gas system to reduce resistance. 2.1.2 holding the induced draft fan, the flue gas separator baffles and dampers in the fully open position. 2.1.3 The experiment showed combustion boiler, proper control of excess air in the furnace. 2.1.4 adjustment chamber negative pressure, air leakage reduction furnace and the flue. 2.2 routine maintenance and testing 2.2.1 induced draft fan performance test to determine the optimum operating point and efficient workspace. 2.2.2 boiler, air preheater, a flue, ESP and other system leakage inspection, process. 2.2.3 timely check processing chassis, shaft seal leakage. 2.3C / D repair, eliminating defects 2.3.1 down strict accordance with movement clearance adjusting fan. 2.3.2 induced draft fan blade defect action elimination hand vane opening adjustment. 2.3.3 Importers and induced draft fan baffle opening check. 2.3.4 duct tightness check process. 2.3.5 wave plate replacement air preheater, rinsed sector plate gap adjustment. 2.3.6 eliminate dust defects and improve collection efficiency. 2.3.7 clean flue gas desulfurization system, flue resistance is reduced. 2.3.8 eliminate soda boiler pipe leakage defects. 2.4A / B repair and transformation 2.4.1 Check and repair the fan blades, replace seriously damaged blades if necessary. 2.4.2 for energy saving fan efficiency below 75%. 2.4.3 The fan motor frequency transformation. 2.4.4 of the precipitator, if necessary, transform and improve collection efficiency.

2, tightness test

Indoor gas boiler pipes tightness test should be consistent with the following requirements:

① low pressure gas pipe test pressure boiler for planning a pressure not less than 5kPa, under the experimental pressure regulator least 30min, and view all the joint with the blowing agent, no leakage, no pressure gauge pressure drop qualified equipment. When the experimental system stainless steel corrugated hose, plastic composite pipe, oil hose, when the plastic cover brass, IH pressure not less than the experiment, in addition to sealing the respective view point, the end surface of the cladding layer should also whether there is leakage phenomenon View.

② medium pressure gas pipelines boiler pressure test planning more pressure and not less than 0.1Mpa. Under the experimental pressure regulator less than 2h, and view all joints with a blowing agent, no leakage, no pressure drop pressure measurement device qualified.

It provides fast side of manufacturing companies commercial 6t boiler bhutan equipment, installation and commissioning after all normal, we immediately put into use, the hotel did not delay the normal heating. Meanwhile boiler capacity, energy efficient, fully able to meet the needs of heating and bathing water in our hotel rooms. --customer feedback