High Efficiency 1t Natural Gas boiler Cheap Turkey

ZG high efficiency 1t boiler cheap turkey 's boiler exported to Sri Lanka this time is a szs series of oil gas boilers. This boiler is a double drum vertical installation type "D" arrangement of quick-assembled boilers, with full combustion, no pollution, easy operation and so on. It is a very ideal, high-efficiency, low-consumption, low-pollution green environmental protection product.

Heating high efficiency 1t boiler cheap turkeys can be used in many areas. The oil and gas boilers produced by ZBG are often used in hospitals, hotels, schools, communities, apartments, office buildings, farms, and greenhouses. In general, the 0.7MW oil and gas boiler produced by ZBG can heat the area of 10,000 square meters. Of course, more factors will be involved in actual use. The improvement of hospital heating system is the focus of many people.

Gas-fired steam high efficiency 1t boiler cheap turkey safe operation Tidbits gas steam boiler safe operation Tips 1. The operator should be familiar with the structure and principles of the furnace and the production of basic requirements for thermal equipment, and constantly sum up experience in practice, control coal thickness, so that the full combustion reduce chimney smoke, protect the equipment in a safe, efficient operation. 2. The new oil furnace or restart long home, gas steam shall dehydration stage heating requirements. 3. export oil temperature should be set below 280 ℃, when the oil temperature exceeds 200 ℃, should pay more attention to temperature, oil temperature should slow down, only non-oil change and over-temperature operation. 4. close contact with production, timely and slow down the oil temperature, while meeting production requirements, taking oil lower, will help extend the life of gas and steam energy savings. The normal oil level: the lower tank oil level is low, high-high oil groove. This ensures that the emergency shutdown when cold oil replacement system and prevents air from entering the pipe. When the high slot in a low oil level should start to replenish gas steam injection pump. 6. The circulation pump is allowed outage in the operation of the burner, when the pump is failure or power outage, Fan stop, depending on oil temperature and take appropriate emergency measures: rapid opening valve 7, the cold head tank oil up through the furnace coils to the low tank. 8. Coal and wet coal hearth fire or discharge out of the furnace, non-water washed pouring furnace. These measures should be completed within 3 to 5 minutes, to prevent the high oil temperature coke deposits other accidents. 9. normal shutdown, the oil temperature should be reduced to below 100 ℃, stop the pump before. 10. When the outlet pressure differential below the set value, the induced draft fan should outage. Then there is a fault system, feedback should be immediately removed or, if necessary, should pressure fire outage. 11. fireman should stick to their posts, do a good job operating records and shift work, and regular inspection and maintenance equipment.

Since March, Harbin City Bureau of ecological environment began to organize special supervision to carry out coal-fired high efficiency 1t boiler cheap turkey enforcement issues, 309 sets of unfinished mention boiler and marked the transformation of the city after the 2018 boiler to mention 409 logo revamping supervise enforcement actions taken joint law enforcement and the monitoring center the way, as has been completed, the list of Wuchang city, Bayan, Mulan, Tonghe County, Yilan County, Founder county business checks on double Harbin city.

After steering group went to Harbin City, district, county (city), by reporting to listen territorial ecological Environment Agency and the inspection unit, a preliminary understanding of corporate profiles, boilers, pollution control facilities and pollution-line monitoring equipment on-site supervision and inspection, found the three groups of coverage and is not completely blocked, businesses can not provide the proposed supervisory monitoring data reports or third-party monitoring data report corrections and comments, requirements of territorial ecological Bureau to investigate and punish.

The special supervision and inspection work time, heavy task, environmental inspectors and monitoring to front-line staff in site supervision, to overcome the difficulties, give full play to law enforcement officers proficient in professional knowledge and rich practical experience and other advantages, the successful completion of stage special inspection of law enforcement tasks.