5tons gas steam boiler in qatar for seafood industry production

20 tph WNS gas-fired fire tube boiler project for biotechnology industryA 5tons steam boiler in qatar for seafood industry production is one of the essential facilities of enterprises, which has a direct impact on the quality of the production line. YAN TAI HAI RUN SI BIOTECHNOLOGY Co., Ltd. specializes in manufacturing and wholesale of food and feed supplements as well as extension service of biotechnology. This company planned to expand business scope and invest 200 million yuan for the new production project of enzyme protein. As the country has been strengthening the comprehensive control of air pollution in industrial enterprises, and promoting the transformation construction of coal to gas and coal to electricity in recent years, the company decided to purchase one set of 20tph low NOx natural gas-fired steam boiler to response to the national call. With outstanding advantages of quality and service, ZOZEN won the favor of YAN TAI HAI RUN SI BIOTECHNOLOGY Co., Ltd.. ZOZEN provided the company with the WNS series gas-fired (oil-fired) boiler. This series gas-fired (oil-fired) boiler has wide fuel adaptability, which is applicable to a variety of fuels, including natural gas, coal gas, diesel and many other fuels. Furthermore, it adopts a large-diameter corrugated furnace and the high efficiency heat transfer element thread smoke tube to ensure the complete combustion of fuels; the thermal efficiency can reach above 98%. It is also equipped with an advanced low NOx burner imported from Europe to achieve the ultra-low NOx emissions. Both the product performance and exhaust emission entirely meet the actual requirements of the company.

After the gas hot water boiler hot water boiler vaporization emergency 1. Vaporization handler circulating pump stops abnormally pump failure caused by: ① blower stops running immediately. ② immediately open the door, take measures to pressure the fire, lift the chute gate, cutting off the supply of coal grate. ③ In the case of boiler pressure not greater than 0.6MPa (600KPa), the exhaust valve to follow, only a sharp rise in pressure in the boiler deflated, used only relief exceeds 0.9MPa, and the exhaust process to be carried out slowly, prevention boiler due to loss of pressure and more violently again vaporized. ④ close the boiler water, water main gas valve. ⑤ open stop valve recirculation line, to ensure that the water supply pipe velocity convection heating surface (economizer) to prevent re-vaporization of the economizer. ⑥ The operation of the above operation, at the same time to pay the boiler to reduce the boiler water temperature and the furnace pressure. ⑦ After the boiler pressure is normal, i.e., opening the standby circulating pump, into the normal combustion. 2. Treatment failure or sudden loss of power boiler vaporization of power: ① immediately open the door, lift the coal chute slide gate to take pressure fire measures to reduce the oven temperature. ② Grate with the fastest speed in order in the shortest time to fire onto the slag tap. ③ the degree of treatment in the first case. Once a short time can not supply heating network system, antifreeze should take emergency measures. 3. Due to excessive heat boiler boiler vaporization process: ① the immediate closure of the drum, induced draft fan. ② immediately open the door, take measures to pressure the fire, lift the supply of coal chute slide gate, off of coal, while the grate into fast gear. ③ In the case confirmed the presence of water, the boiler can supply water to the boiler body, boiler out of the water while closing the main valve. ④ Open line stop valve recirculation pump to ensure water velocity convection heating surface of the pipe, to prevent the economizer again vaporized. ⑤ Open circulating pump with jog mode, jog each time less than 30 seconds, again less than one minute jog interval. Jog purpose is to reduce the boiler water temperature, while preventing a large amount of steam into the pipeline system. ⑥ back into place after the safety valve, circulating pump running, and then the normal burning stove. 4. Water boiler system run vaporization process due to water loss, loss of pressure caused by: ① immediately closed drum, induced draft fan. ② out of the water while closing the main valve and the boiler circulating pump. ③ take the same measures to cool the furnace tube described above. ④ Open stop valve recirculation line. ⑤ rely exhaust valve until the safety valve back into place. ⑥ until the boiler water temperature drops below 50 ℃, when the temperature of the furnace temperature less number 200 ℃, again within the boiler feed water, water course to be carried out slowly, to prevent harm to the boiler when the temperature is too large. ⑦ After processing leakage fault, the system time to the replenishment, and out of the water boiler always open the valve, and the circulating pump, and then normal combustion.

How to choose the heat exchanger is a 5tons steam boiler in qatar for seafood industry production Shandong? To steam boiler insulation damaged condition for viewing prior to use, view of the burner, to see whether the normal operation, but also to see to make sure the valve open position is correct, to view the attachment security equipment, instrumentation equipment and devices automatic control equipment must meet the requirements. Point blast furnace steam boiler admit items are: open oil circulation pump before and after the valve, the valve open oil heating process, mediation high tank level in a reasonable position, admitted that the gas pressure before the gas burner must be burned in power scale, power supply normal.

2018, the Group's trade unions lead the effort and hard work. In June - July, the group took part in the front-line staff union workers vocational skills competition in Henan welders trials, employee segment slowly rise to become the dark horse on the field, won the "female bonding child" in the world, made in Anyang City fifty-one Heroine Heroine number of honorary titles. 2018, the group led everyone happy union work. "Division with only" mechanism in the company to bear fruit, youth workers get training and skills gradually improved. Rich in the traditional sense of "apprentice ceremony" making our "division with only" job skills training to become a shining Anyang City workers "business card." On the municipal key tournament organized by the company, young welder you compete to catch the top ten among them are four outstanding students under the "division with only" mechanism generated.