Distributor Natural Gas fired boiler High Efficiency Bhutan

When customers need to buy oil and gas distributor fired boiler high efficiency bhutans, they need to know the boiler capacity that they need. Because the boiler will consume a lot of fuel during operation, the boiler capacity will cause unnecessary losses and increase the boiler cost.

Method for safe operation of steam distributor fired boiler high efficiency bhutans steam boiler before use, must be checked for damage of the insulating layer, to check the burner is operating correctly, and to check the position of the opening degree of the valve to ensure it is correct. Must be checked for automatic control instruments and equipment safety equipment accessories, equipment, in order to comply with the requirements. Check item prior to ignition of the steam boiler: open valve before oil circulation pump, oil heating valve is opened, adjusted reasonably high level of the tank, the gas pressure is determined before the natural gas burner ignition must be within the range, the power good . Refers to the operation of the steam boiler is refluxed pressure activated device circulating pump, the circulating pump outlet, inlet, outlet, and the system, it is in the normal range. Circulation pump run for 30 minutes. After the stability of the system, the next step. Open the gas tube steam boiler manual valve, button start-up burner, natural gas burner into the furnace, and then the ignition, the flame remains stable, i.e. is in a safe operating condition. In the firing process steam boiler, if you accidentally quenching phenomenon occurs, the device will automatically interlock burner saver appear. It must be promptly cut off the natural gas pipeline to start the furnace purification. Replacement of the residual gas in the furnace and closed. The system load requirements, temperature requirements and thermal oil outlet, the burner can automatically adjust the size of the fire source.

In accordance with article 1.2 13.3.6 to 13.3.8 "distributor fired boiler high efficiency bhutan design specifications" (GB50041-92): gas-fired boiler provided in the other buildings should be not less than 3 times the amount of ventilation, ventilation hour It does not include the amount of combustion air volume. Dangerous operating room and the like between the gas regulator, the amount of ventilation per hour, should be less than 3 times, when not meet the requirements natural ventilation, mechanical ventilation should be provided, and should be less than 8 air changes per hour accident ventilation times. Fuel pump and reservoir 45 ℃ flash point less than the underground tank of combustible oil, except that natural ventilation, the fuel pump mechanical ventilation 10 air changes per hour should times, six times per hour ventilation should depot mechanical ventilation. The above three are in each room in order to ensure exclusion of air and flammable hydrocarbon disposed a predetermined minimum ventilation rate.

Lanzhou City, Gansu Province, the transformation of coal-fired distributor fired boiler high efficiency bhutan control policy in accordance with the latest introduction of the "not big on the small" principle to give "Yijiangdaibu" financial support to owners of units, specific subsidies are as follows:

1, for a single 1 ton / hour or more than 0.7 megawatts of clean energy and coal-fired boilers by 100,000 yuan to subsidize steam tons of standard /.

2, coal-fired heating boilers mentioned standard governance and meet the national air pollutant emission limits in particular boiler, according to subsidize 50,000 yuan / ton steam standards, subsidies does not exceed 30% of the total investment quota.

3, for a single 1 ton / hour or 0.7 megawatts of utility units (including schools, health centers, hospitals, neighborhood or township government offices and other public units) clean energy transformation of coal-fired heating boilers in accordance with the actual heating area subsidies, allowances of 100 yuan / square meter.